Control Board Replacement
311990F
19
Installation
1.
Push grommet and power cord wires into strain
relief in control board (18).
2.
Connect power cord connectors to terminals indi-
cated on control board (18).
3.
Slide control board into place on side of motor front
endbell.
4.
Replace three screws (11). Torque to 30-35 in-lb
(3.4-3.9 N.m).
5.
Connect motor connector (D) and pressure control
assembly connector (A).
6.
Install shroud (12) with screw (13). Install front cover
(32) with two screws (11). (see illustration, page 15).
7.
Install toolbox (3) with two screws (5) (190
ES
, 210
ES
Series A).
8.
Install kick stand (66) (210
ES
Series A).
Route power cord (19) between coupled hose (42)
to filter manifold and sprayer frame.
ti6122a
18
Grommet
Strain
Relief
120V
ti9132a
18
C
Bottom View of Sprayer
ti9153a
42
19
11
18
ti9154a
120V
ti9132a
18
D
A