Startup
310820H
11
Startup
1
Turn pressure control to
lowest pressure.
2
Turn power ON.
3
Increase pressure 1/4 turn
to start motor. Allow fluid
to circulate through drain
tube for 15 seconds.
4
Turn prime valve
horizontal.Take spray gun
trigger safety OFF.
5
Hold gun against grounded
metal flushing pail. Trigger
gun and flush 1 minute.
6
Inspect for leaks. Do not stop
leaks with hand or a rag! If
leaks occur, perform
Pressure Relief, page 7.
Tighten fittings.
7
Place siphon tube in paint
pail.
8
Trigger gun again into
flushing pail until paint
appears.
ti5305a
ON
OFF
ti5303a
15 sec.
ti5307a
1/4 turn
TIA
TIAB
TIA