Installation
6
332453A
USB Kit, 24R936
1.
Perform the
Shutdown
procedure in the Exact-
aBlend AGP Advanced Glazing Proportioner,
Setup-Operation manual.
2.
Mount the USB Module to the side of the electrical
enclosure. Torque the bolts to 2.6 ft-lb (3.5 N•m).
3.
Connect the longest CAN cable to the USB Module.
Route the CAN cable along the boom. Follow the air
hoses and electrical lines that are installed.
4.
Connect the CAN cable extension to the CAN cable
end. Connect the other end to the Fluid Control
Module (FCM).
5.
Refer to the ExactaBlend AGP Advanced Glazing
Proportioner, Setup-Operations manual for screen
details.