Installation
3A8812B
5
Lower DIN Rail Components
Install the pressure switches from left to right on the
lower DIN rail. Match the orientation of the existing
pressure switch with the air connection pointing down.
See F
1. Install the PTI pressure switch (D) next to the
existing pressure switch.
2. Install the ERI pressure switch (E) next to PTI
pressure switch (D).
Manifold Components
Remove the plug, and install the EEO solenoid (F) and
the EEO solenoid air fitting (FF) in the lower most
location of the manifold. See F
Install Bulkhead Fittings
Remove hole plugs as needed, and install bulkhead
fittings inside the isolation cabinet.
Electronics Control Panel Bulkhead Fittings
1. Install two bulkhead fittings to the bottom of the
electronics control panel in the following order (see
. 4):
- PTI bulkhead fitting (G)
- ERI bulkhead fitting (H)
2. Apply labels (15) on top of the existing port labels
as shown in F
. 3.
F
IG
. 1 DIN rail components
A
B
C11
D
E
C12
C13
C14
Lower DIN Rail
Upper DIN Rail
F
IG
. 2 Manifold components
F
IG
. 3 Control panel labels
E
FF
F
G
H