background image

Setup 

6

Fill Wet-cups

Keep the felt washers in the pump wet-cups saturated 

with ISO pump oil. The lubricant creates a barrier 

between the ISO and the atmosphere.

Fill wet-cups through the slots in the plate, or remove a 

screw and swing the plate to the side.

The pump rod and connecting rod move during 

operation. Moving parts can cause serious injury such 

as pinching or amputation. Keep hands and fingers 

away from the wet-cup during operation. Shut off 

power before filling the wet-cup.

F

IG

. 4 Fill Wet Cup

Slots

TI17124a

Summary of Contents for PJR REACTOR E-8p

Page 1: ... European explosive atmosphere locations 2000 psi 14 MPa 138 bar Maximum Working Pressure See page 3 for a list of models Important Safety Instructions Read all warnings and instructions in this manual before using this equipment Save these instructions EN Setup Start Up Overview VEE AIR ONE SP Air Purge Gun 2 Part Adhesive Spray Applicator Portable Plural Component Sprayer ...

Page 2: ...ves E Control Panel F Electric Motor and Drive Housings G Hose Bundle H Spray Guns J Recirculation Outlet L Outlet Hose Connections M Power Cord P Fluid Inlet FIG 1 Component Identification JUST THE TIP THAT S ALL YOU NEED ADD JUST THE TIP TO YOUR V MANIFOLD TO ENABLE AIR PURGE SPLATTER FULL SPRAY AND STATIC BEAD SPRAY CAPABILITIES IN 1 GUN ...

Page 3: ...actor NOTE The default is to shut down if a status code indication occurs Codes 1 and 2 may be set to disable automatic shutdown if desired see page 22 You cannot set the other codes FIG 2 Controls and Indicators I Power Switch Status Indicator Motor Pump Control Function Knob Status Codes TI17123b Icon Setting Function Park Stops motor and automatically parks pumps Slow Recirc Slow recirculation ...

Page 4: ... system Fluid supply container follow local code Object being sprayed follow local code Solvent pails used when flushing follow local code Use only conductive metal pails placed on a grounded surface Do not place the pail on a nonconductive surface such as paper or cardboard which interrupts grounding continuity To maintain grounding continuity when flushing or relieving pressure hold metal part o...

Page 5: ...scfm 0 112 m3 min compressed air for the air operated spray guns to work correctly Connect the main air supply to the quick disconnect fitting on the unit The air supply hose must be at least 5 16 in 8 mm ID up to 50 ft 15 m or 3 8 in 10 mm ID up to 100 ft 30 m Flush Before Using Equipment The equipment was tested with lightweight oil which is left in the fluid passages to protect parts To avoid c...

Page 6: ...re Fill wet cups through the slots in the plate or remove a screw and swing the plate to the side The pump rod and connecting rod move during operation Moving parts can cause serious injury such as pinching or amputation Keep hands and fingers away from the wet cup during operation Shut off power before filling the wet cup FIG 4 Fill Wet Cup Slots TI17124a ...

Reviews: