Installation
3A2817A
19
7.
Turn jam nut (29) counter-clockwise until it stops.
Tighten jam nut by hand, then tap 1/8 to 1/4 turn
with a 20 oz (maximum) hammer to approximately
75 ft-lb (102 N
•
m).
8.
Install suction tube (60) and high pressure hose
(45). Tighten fittings.
9.
Fill packing nut with Graco TSL until fluid flows onto
top of seal.
10. Replace cover (70) over screws. Push cover down
into place. Tighten screws (12).
ti19382a
45
60
ti19376a