Startup
20
332144E
Startup
1.
2.
Set function knob to Slow Recirc
or Fast Recirc
. See Heatup Guidelines, page 21, then con-
tinue with steps 3-6.
3. Turn on Heater Power.
4.
Set temperatures:
a.
Press
or
to change temperature
scale.
b.
Press
to display target temperatures.
c.
To set
heat zone target temperature,
press
or
until display shows
desired temperature. Repeat for
zone.
d.
Press
to display actual temperatures.
5.
Circulate through heater until temperature readouts
display desired temperature. See Table 6.
6.
Adjust heat controls as necessary for a stable spray
temperature.
NOTE: Heatup times are based on 70°F (21°C) starting
material temperature and 70°F (21°C) ambient tempera-
ture.
NOTE: Different fluids will absorb heat at different rates.
When refilling a warm machine, heatup times will be
less.
Heated fluid can cause equipment surfaces to
become very hot. To avoid severe burns:
• Do not operate Reactor without all covers and
shrouds in place.
• Do not touch hot fluid or equipment.
• Allow equipment to cool completely before
touching it.
1
2
3
4
5
6
7
8
9
10
0
+
-
1
2
3
4
5
6
7
8
9
10
0
+
-
OR
ti21489a
°
F
°
C
Table 6: Approximate heatup time for starting a cold
machine with 5 gallons (19 liters) per side
Fluid Spray Target
Temperature
120VAC
230VAC
35 ft (10.7 m) Hose
(1 bundle)
125°F (52°C)
15 minutes
10 minutes
170°F (77°C)
40 minutes
20 minutes