Start Up - Air Assist
3A6748B
29
4.
Prime pump.
a.
Place material hose in hopper.
b.
Turn ON/OFF Switch to ON.
c.
Place Pump Mode Switch in down
position. Turn Pressure Control
Knob clockwise 1/4 turn.
d.
Once a steady stream flows from
the material hose, run for an
additional 30 seconds.
e.
Turn ON/OFF Switch to OFF.
ti11697a
Summary of Contents for T-MAX 506
Page 53: ...Repair 3A6748B 53 6 Install motor cover using four screws 7 Connect pump to hopper ...
Page 63: ...Repair 3A6748B 63 Cross Section Reference Pump Ball Identification 6912 ...
Page 67: ...Notes 3A6748B 67 Notes ...
Page 68: ...Parts Hopper Frame 68 3A6748B Parts Hopper Frame b a ...
Page 70: ...Parts Power Module 506 657 70 3A6748B Parts Power Module 506 657 PAGE 78 PAGES 74 75 ...
Page 72: ...Parts Power Module 6912 72 3A6748B Parts Power Module 6912 PAGE 80 PAGE 76 ...
Page 76: ...Parts Pump 25E668 6912 76 3A6748B Parts Pump 25E668 6912 ...
Page 78: ...Parts Control Box 506 657 78 3A6748B Parts Control Box 506 657 ...
Page 81: ...Wiring Diagrams 3A6748B 81 Wiring Diagrams 506 657 ...
Page 82: ...Wiring Diagrams 82 3A6748B 6912 US ...