Setup/Startup
3A8108A
7
Setup/Startup
Pressure Relief Procedure
1.
Turn engine off by pressing and holding
the Engine Stop. The carriage will
automatically raise when the engine is
turned off.
2.
Lock carriage in the up position by
turning and pushing locking pins in on
both sides of the carriage.
3.
Open air drain valve, as shown, to
relieve air pressure.
This equipment stays pressurized until
pressure is manually relieved. To help
prevent serious injury from moving parts,
follow the pressure relief procedure
before cleaning, checking, or servicing
the equipment.
Summary of Contents for TapeLazer HP Automatic
Page 15: ...Setup Startup 3A8108A 15 7 Using a 1 4 in Allen wrench tighten bolts ...
Page 25: ...Operation 3A8108A 25 TapeLazer LiveLook Display ...
Page 51: ...Troubleshooting 3A8108A 51 Solenoid Ports Reference ...
Page 52: ...Parts 52 3A8108A Parts TapeLazer Parts ...
Page 54: ...Parts 54 3A8108A Front End Parts ...
Page 56: ...Parts 56 3A8108A Carriage Applicator Parts ...
Page 58: ...Parts 58 3A8108A Display Unit Parts ...
Page 60: ...Parts 60 3A8108A Additional Parts ...
Page 62: ...Air Line Schematic 62 3A8108A Air Line Schematic ...
Page 64: ...Wiring Diagram 64 3A8108A Wiring Diagram ...
Page 65: ...Universal Symbols Key 3A8108A 65 Universal Symbols Key ...