Setup
20
313873J
Setup
Initial Machine Setup
Perform this setup procedure to prepare the machine for
initial operation.
1.
Locate the machine.
a.
Bolt machine to original shipping pallet before
lifting.
b.
Locate the machine on a level surface. See
ments.
2.
Connect electrical cord.
Electrical Cord Requirements
NOTE:
Power cord is not supplied. See the following
table.
† Residual Current Device (RCD) must be rated at
300 mA if installed.
Electrical Cord Wires by Model
230V, 3 phase:
L1, L2, L3, GND
400V, 3 phase:
L1, L2, L3, N, GND
Electrical Requirements
on page 4 for detailed electrical require-
ments information.
a.
Use 5/32 in. or 4 mm hex allen wrench to con-
nect the power leads to L1, L2, L3, and N as
applicable.
b.
Connect green wire to ground (GND).
The machine is not properly grounded until this setup
procedure is performed. To prevent risk of electric
shock, do not start the machine until this setup proce-
dure is completed.
NOTICE
Be careful not to hit hydraulic power pack drain port
while moving machine. Applying significant force to
drain port may damage the hydraulic tank.
NOTICE
To prevent machine damage, do not expose system
to rain.
Installing this equipment requires access to parts
which may cause electric shock or other serious injury
if work is not performed properly. Have a qualified
electrician connect power and ground to main power
switch terminals. All electrical wiring must be done by
a qualified electrician and comply with all local codes
and regulations.
Table 1: Power Cord Requirements
Model
Cord Requirements
AWG (mm
2
)
230V, 3 phase
8 (8.4), 3 wire + ground
400V, 3 phase
6 (13.3), 4 wire + ground †
F
IG
. 10: 400V, 3 phase shown
r_24C686_313998_1a
L1
L2
L3
N
GND