Setup
22
313873J
4. Install feed system.
NOTE:
This step only connects the feed system. Do not
allow fluid to flow into the system in this step.
Supply hoses from feed tank should be 2 in. (51 mm) ID
minimum.
a.
Close inlet ball valve.
b.
Connect and tighten component B (Blue) supply
hose to the 2 in. npt(f) fitting on the component
B (Blue) fluid inlet at the base of the pump
lower.
c.
Repeat previous steps for A (Red) material side.
5. Connect system base to dispense
stand.
a.
Connect fluid hoses.
b.
Connect electrical wires.
c.
Connect ground wire.
6. Connect 1/2 in. air supply to dis-
pense stand air inlet.
7.
Check hydraulic fluid levels.
The hydraulic reservoirs are filled at the factory. See
on page 86 for hydraulic fluid specifica-
tions.
8. Fill pump wet cups 2/3 full with
IsoGuard Select Fluid.
10.Perform ADM setup.
NOTE:
All ADM setup items are located in the Setup
Appendix B - ADM Setup Screens Over-
beginning on page 59 for more information.
on page 26 for help
with operating the ADM including how to modify set-
tings.
a.
Navigate to
screen then set gen-
eral system settings. See page 63.
b.
Navigate to
screen then set units
of measure. See page 63.
c.
Navigate to
screen then
enable/disable system features. See page 64.
NOTICE
Use at least 10 layers of PTFE tape and use pipe
dope on the fluid inlet fitting to prevent galling.
NOTICE
To prevent machine damage, air supply must be fil-
tered and dried.
ti17664a1
ti14725a