Section 3 - Operation
3-12
82104002
2. Move left joystick to left (G) to swing left or to
right (H) to swing right.
3. While pushing left joystick forward (F) to
extend boom, push right joystick forward (B)
to lower boom into position for start of cut.
4. Move right joystick to right (C) to open bucket
or to left (D) to close bucket for correct
penetration. Teeth should angle downward
slightly (about 5 degrees). Angle may be
greater for soft digging.
Summary of Contents for D152
Page 6: ...Read This First d 82104002 NOTES...
Page 10: ...Table of Contents iv 82104002...
Page 24: ...Section 1 General Safety Practices 1 14 82104002 NOTES...
Page 39: ...Section 2 Pre Operation and Controls 2 15 82104002 This Page Intentionally Left Blank...
Page 42: ...Section 2 Pre Operation and Controls 2 18 82104002 NOTES...
Page 55: ...Section 3 Operation 3 5 82104002 This Page Intentionally Left Blank...
Page 76: ...Section 3 Operation 3 26 82104002 This Page Intentionally Left Blank...
Page 96: ...Index 2 82104002 Travel Hazard 1 8 U Upperstructure Cab Controls Indica tors 2 8...