Section 3 - Operation
3-23
82104002
Boom Stow Procedure
1. With teleboom extended, stow boom in boom rest.
2. Retract telescope boom until the boom position decal is visible in the bottom
smaller hole in the main boom, as illustrated:
Securing Unit for Driving
Drive to and from job site only under the following conditions:
• Boom is in boom rest.
• Mirrors are clean and properly adjusted for visibility.
• Doors and upperstructure windows secured in closed position.
• No load attached to any part of machine.
• Tires inflated to proper pressure.
• Seat belt buckled across lap.
• Drive in accordance with Federal, State, and Local requirements.
• Plan your route.
OAC2690
Summary of Contents for D152
Page 6: ...Read This First d 82104002 NOTES...
Page 10: ...Table of Contents iv 82104002...
Page 24: ...Section 1 General Safety Practices 1 14 82104002 NOTES...
Page 39: ...Section 2 Pre Operation and Controls 2 15 82104002 This Page Intentionally Left Blank...
Page 42: ...Section 2 Pre Operation and Controls 2 18 82104002 NOTES...
Page 55: ...Section 3 Operation 3 5 82104002 This Page Intentionally Left Blank...
Page 76: ...Section 3 Operation 3 26 82104002 This Page Intentionally Left Blank...
Page 96: ...Index 2 82104002 Travel Hazard 1 8 U Upperstructure Cab Controls Indica tors 2 8...