EXTENSION CHAIN REPLACEMENT
DISSASSEMBLY
Retract boom completely.
Remove rear boom cover.
Remove extension (large) chain adjusting and jam nuts.
Remove hose retainer and jam nuts. Disconnect hoses.
Remove bolts holding hose guide pan to front of strongback.
Remove strongback.
Unpin retraction (small) chain from chain ears at back of third section.
Allow chain to lie on bottom of 1st section.
Unbolt take-up beam bracket from back of section two. Pull beam and
hose guide pan out back of boom.
Unpin extension chain from ears at back of section three.
REASSEMBLY
Note: Replace chain ends whenever chain is replaced
Pin extension chain to ears at back of section three.
Lay chain and hoses in hose guide pan.
Carefully slide take-up beam and guide pan into boom allowing chain
and hoses to roll over sheaves at front of beam.
Bolt take-up beam bracket into back of section two.
Note: Use LOCTITE 242 (blue-medium strength) on all bolts and
torque to specification.
Pin retraction chain to ears on back of section three.
Reinstall strongback.
Bolt hose guide pan to strongback.
Reconnect extension chain. With crowd cylinder fully retracted,
tighten extension chain until there is no slack in retraction
chain.
Reconnect hoses and hose retainers.
Reinstall rear boom cover.
1.
2.
3.
4.
5.
6.
7.
8.
9.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
8
Summary of Contents for LOED 534A
Page 5: ...MODEL 534 6 000 Capacity 4 FIGURE 1...
Page 20: ...19 FIGURE 19...
Page 28: ...CARRIER SUBASSEMBLY FRONT 24 TO 1 REAR 35 TO 1 27 FIGURE 24...
Page 41: ...SECTION II TROUBLE SHOOTING 41 FIGURE 40...
Page 44: ...TROUBLESHOOTING GUIDE FOR GEAR TYPE HYDRAULIC PUMPS 44 FIGURE 43...
Page 55: ...REAR DRIVE MOTOR 55 FIGURE 72...
Page 56: ...PARTS IDENTIFICATION 56 FIGURE 73...
Page 74: ...FRONT DRIVE MOTOR before s n 237 74 FIGURE 119...
Page 75: ...75 FIGURE 120...
Page 88: ...FIGURE 150 FIGURE 151 88...
Page 89: ...FIGURE 152 89...
Page 90: ...FIGURE 151 FIGURE 153 90...
Page 91: ...FIGURE 154 91...