Section 3 - Operation
3-15
80804002
3.6
REMOTE CONTROL PREPARATION
Preparing Undercarriage for Remote Control Operation
Remote travel is to be used for positioning unit at job site, not for over-the-road
driving. After reaching job site, perform the following to prepare undercarriage for
remote control operation:
1. Stop the machine in a safe level area.
2. Apply the parking brake.
3. Engage axle and interaxle differential lock (refer to page 3-11 for procedure;
interaxle differential lock applies to XL4100IV & XL5100IV only). Front axle drive
may be selected (if equipped).
4. Put transmission in neutral.
5. When both sections of air system reach at least 100 psi, stop engine. Key must
be in “OFF” position for remote operation.
6. Depress remote portion of travel/remote switch.
7. Proceed to upperstructure cab.
Preparing Upperstructure for Remote Control Operation
All instructions on undercarriage cab remote control decal must be followed before
starting machine in remote operation.
1. Place control cut out lever in locked/inactive position (refer to page 2-39).
2. Turn ignition switch to “RUN” position.
3. The three monitor lights shown above should illuminate and then go out.
4. Turn ignition switch to “START” position to start engine and/or engage hydraulic
pump. If engine fails to start, turn ignition switch to “OFF” position and repeat
steps 2 through 4. If starter will not engage to crank engine, check for proper
park brake and gearshift positions in the undercarriage cab and verify that the
joystick activation lever is in the locked/inactive position.
5. Operate engine at full throttle for upperstructure operation.
6. Position control cut out lever in the unlocked/active position to activate and
engage joystick controls and pedals in remote operation.
OAC0700
Summary of Contents for XL3100IV
Page 6: ...Read This First d 80804002 NOTES...
Page 24: ...Section 1 General Safety Practices 1 14 80804002 NOTES...
Page 33: ...Section 2 Pre Operation and Controls 2 9 80804002 NOTES...
Page 53: ...Section 2 Pre Operation and Controls 2 29 80804002 NOTES...
Page 61: ...Section 2 Pre Operation and Controls 2 37 80804002 NOTES...
Page 79: ...Section 3 Operation 3 9 80804002 NOTES...
Page 108: ...Section 3 Operation 3 38 80804002 This Page Intentionally Left Blank...
Page 152: ...Section 5 Lubrication Maintenance 5 38 80804002 NOTES...
Page 164: ...Section 7 Specifications 7 10 80804002 This Page Intentionally Left Blank...