Appendix C: XL 5200 Operating Cycle Times
OPERATING TIME TEST
Run Boom Out - Level
Run Boom In - Level
Boom In - Lower from 30° to Ground
(with bucket)
Boom In - Raise from Ground to 30°
Boom Out - Raise from Ground to 30°
Boom Out - Lower from 30° to ground
Boom Bounce Limited to 3 (Boom at full extension,
empty bucket, Hoist Up and stop at level)
Tool Open
Tool Close
Swing Clockwise/Counter-clockwise -Boom In/Out
Swing Brake Sets after Upperstructure Stops
Tilt 220° Max. - Clockwise/Counter-clockwise
Crawler Speed (2.4 MPH)
Time for 100 ft. (High Speed) Forward/Reverse
Straight Travel - Deflection to be less than 3 ft. in 100 ft.
High Range - Sprocket Speed - 27.9 RPM
Time for one Track Revolution - 7.8 RPM
Main Pump Power Setting - Engine drawdown when combining
Swing, Hoist Up, Boom Out, Machine moving with full bucket
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
A.
B.
C.
D.
SECONDS
MIN.-MAX.
5.4
-
6.6
-
2.6
-
2.6
-
3.0
-
1.2
-
2.4
-
4.8
-
9.6
-
3.0
-
7.8
-
28.8
-
1900 RPM
5.64
7.2
4.2
4.2
3.6
2.4
3.0
6.0
10.8
3.6
10.8
31.8
68
Form No. 29704
Summary of Contents for XL4000
Page 2: ......
Page 73: ......
Page 76: ... 5MP ...
Page 145: ......
Page 146: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 175: ......
Page 176: ......
Page 177: ......
Page 178: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 207: ......
Page 208: ......
Page 210: ...500P ...
Page 229: ......
Page 230: ......
Page 245: ......
Page 246: ......
Page 247: ......
Page 248: ......
Page 265: ......
Page 266: ......
Page 267: ......
Page 268: ......
Page 280: ......
Page 281: ......
Page 282: ......
Page 297: ......
Page 298: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......