Place carrier transmission in “LL4”. Place carrier into remote operation. Set carrier brakes in upper cab to locked
position.
Put high pressure gauge (10,000 psi) on load sense test port. Run engine at full RPM and depress travel pedal
for forward travel. Gauge should read 3,000 - 3,100 psi.
See Note Below. Adjust front port relief as required.
See Figure 12.
Leave high pressure gauge (10,000 psi) on load sense test port and repeat for reverse travel.
See Figure 12.
Throughout production history of the XL 4100 excavator, there have been pressure changes in the
remote travel circuit. These pressures are outlined in chart below.
Form No. 29620 2/97
1.
2.
3.
XI. Remote Travel Pressures
10
FIGURE 12
NOTE!
Summary of Contents for XL4000
Page 2: ......
Page 73: ......
Page 76: ... 5MP ...
Page 145: ......
Page 146: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 175: ......
Page 176: ......
Page 177: ......
Page 178: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 207: ......
Page 208: ......
Page 210: ...500P ...
Page 229: ......
Page 230: ......
Page 245: ......
Page 246: ......
Page 247: ......
Page 248: ......
Page 265: ......
Page 266: ......
Page 267: ......
Page 268: ......
Page 280: ......
Page 281: ......
Page 282: ......
Page 297: ......
Page 298: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......