Form No. 29705 3/99
4
II. Swing Pump Begin Point (continued)
Move the high pressure test hose to the inside test port. Reinstall plug in the outside test port. Purge the air
from the test hose after moving it. See Step 4. Metering the swing left joystick, repeat the procedure
described in Step 5 to test swing left. Adjust the outside screw on the swing pump control to achieve proper
left swing begin pressure.
See Figure 1 & Figure 1A.
After adjustments are made, check operation and metering of the swing circuit. Repeat procedures if swing is
not correct. Also check the maximum torque setting. See the appropriate
Hydraulic Pressure Setting Manual.
NOTE!
If proper adjustment cannot be achieved, contact your Gradall Distributor for assistance.
FIGURE 1
SWING PUMP TEST PORTS
6.
7.
Adjustment screw (inside)
Adjustment screw (outside)
Centering Screw
HP (inside)
Add adapter and test port
here. LP and hoses.
HP and hoses (outside)
Summary of Contents for XL4000
Page 2: ......
Page 73: ......
Page 76: ... 5MP ...
Page 145: ......
Page 146: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 175: ......
Page 176: ......
Page 177: ......
Page 178: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 207: ......
Page 208: ......
Page 210: ...500P ...
Page 229: ......
Page 230: ......
Page 245: ......
Page 246: ......
Page 247: ......
Page 248: ......
Page 265: ......
Page 266: ......
Page 267: ......
Page 268: ......
Page 280: ......
Page 281: ......
Page 282: ......
Page 297: ......
Page 298: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......