background image

 

 

 

 

 

3. Installation requirements

 

3.1 

Choice of location: 

x

 

Distance from basement > 6 m 

x

 

Distance from ground water minimum > 1 m 

x

 

The  distance from the existing or planned  trees  must be at least the expected spread  of the 
trees crown. 

3.2 

Excavation dimensions 

The  measurements  of  the  excavation  is  in  accordance  with  the  number  of  drainage  blocks  to  be 
installed by multiplying the length and width dimensions.  

The following table gives the required earth covering and the maximum installation depth to the lower 
edge of the blind drain; 

 

Transportation loads 

Rain Bloc car and car 

inspect 

Rain Bloc lorry and lorry 

inspect 

  

  

  

Short duration 

Max. 7,5 t/m² 

Max. 10,0 t/m² 

Long duration 

Max. 3,5 t/m² 

Max. 5,0 t/m² 

  

  

  

  

  

 

max. Earth covering* 

2000 mm 

2750 mm 

max. Installation depth* 

3500 mm 

5000 mm 

Light traffic(and 
without traffic 
loads) 

max. Number of layers 

7 layers 

10 layers 

  

 

min. Earth covering  

250 mm 

250 mm 

  

  

  

  

 

 

 

max. Earth covering* 

2750 mm 

max. Installation depth* 

5000 mm 

HGV 12 

max. Number of layers 

10 layers 

  

 

min. Earth covering  

500 mm 

  

  

 

  

  

 

 

 

max. Earth covering*  

2500 mm 

max. Installation depth* 

5000 mm 

SLW 30 

max. Number of layers 

10 layers 

  

 

min. Earth covering  

500 mm 

  

  

 

  

  

 

 

 

max. Earth covering*  

2250 mm 

max. Installation depth* 

5000 mm 

SLW 40 

max. Number of layers 

10 layers 

  

 

min. Earth covering  

500 mm 

  

  

  

  

  

 

  

 

max. Earth covering*  

2000 mm 

max. Installation depth* 

5000 mm 

SLW 60 

max. Number of layers 

10 layers 

  

 

min. Earth covering  

500 mm 

  

  

  

  

The maximum installation depth or earth covering* is related to the ground substance with an inside angle of 

friction from 

˻

 = 50,0° 

De

u

ts

c

h

 

E

n

g

li

s

c

h

 

Page 7 of 8 

Summary of Contents for 300

Page 1: ...ctions enclosed in the transportation packing Any missing instructions must be requested directly from us A complete check of the tank for possible damage must be carried out before the installation in the excavation begins The installation must be carried out by a professional firm Graf drainage block 300 lorry Order Nr 360014 Graf drainage block 300 lorry inspect Order Nr 360015 Graf drainage bl...

Page 2: ...uct a complete system The use of other manufacturers accessories can impair the function of the system and liability for any resulting damages will no longer be covered under the guarantee Volume Gross 300 Litre Net 285 Litre Length 1200 mm Width 600 mm Height 420 mm Connections 12 x DN 150 6 x D 125 6 x DN 100 Weight Rain Bloc car 15 5 kg Rain Bloc car inspect 16 5 kg Rain Bloc lorry 17 5 kg Rain...

Page 3: ...uration Max 3 5 t m Max 5 0 t m max Earth covering 2000 mm 2750 mm max Installation depth 3500 mm 5000 mm Light traffic and without traffic loads max Number of layers 7 layers 10 layers min Earth covering 250 mm 250 mm max Earth covering 2750 mm max Installation depth 5000 mm HGV 12 max Number of layers 10 layers min Earth covering 500 mm max Earth covering 2500 mm max Installation depth 5000 mm S...

Page 4: ...sure a stable interconnection Before filling the module must be completely wrapped in the Geo textile and special attention must be paid to ensure that all the ends and edges of each fleece roll overlap by at least 30 50 cm To conclude the installation the excavation is evenly backfilled and compacted The terrain of the ground surface and substructure should be the expected load to be prepared If ...

Reviews: