3. Installation requirements
3.1
Choice of location:
x
Distance from basement > 6 m
x
Distance from ground water minimum > 1 m
x
The distance from the existing or planned trees must be at least the expected spread of the
trees crown.
3.2
Excavation dimensions
The measurements of the excavation is in accordance with the number of drainage blocks to be
installed by multiplying the length and width dimensions.
The following table gives the required earth covering and the maximum installation depth to the lower
edge of the blind drain;
Transportation loads
Rain Bloc car and car
inspect
Rain Bloc lorry and lorry
inspect
Short duration
Max. 7,5 t/m²
Max. 10,0 t/m²
Long duration
Max. 3,5 t/m²
Max. 5,0 t/m²
max. Earth covering*
2000 mm
2750 mm
max. Installation depth*
3500 mm
5000 mm
Light traffic(and
without traffic
loads)
max. Number of layers
7 layers
10 layers
min. Earth covering
250 mm
250 mm
max. Earth covering*
-
2750 mm
max. Installation depth*
-
5000 mm
HGV 12
max. Number of layers
-
10 layers
min. Earth covering
-
500 mm
max. Earth covering*
-
2500 mm
max. Installation depth*
-
5000 mm
SLW 30
max. Number of layers
-
10 layers
min. Earth covering
-
500 mm
max. Earth covering*
-
2250 mm
max. Installation depth*
-
5000 mm
SLW 40
max. Number of layers
-
10 layers
min. Earth covering
-
500 mm
max. Earth covering*
-
2000 mm
max. Installation depth*
-
5000 mm
SLW 60
max. Number of layers
-
10 layers
min. Earth covering
-
500 mm
The maximum installation depth or earth covering* is related to the ground substance with an inside angle of
friction from
˻
= 50,0°
De
u
ts
c
h
E
n
g
li
s
c
h
Page 7 of 8