4.1 

Connecting the inlet and venting pipes  

To connect the inlet and venting piping there are prepared positions for the openings to be cut out of 
the plastic ribbing. The pipes must extend at least 20 cm into the module. Should an installation over a 
wider  area  be  proposed,  then  there  must  also  be  an  appropriately  greater  number  of  inlet  pipes  to 
ensure an even distribution of the water.  

4.2 

Installation of the drainage blocks 

The geo-textile must be laid out in the excavation that has an even bottom surface with an overlap of 
not less than 30-50 cm. The modules are then positioned on the geo-textile (only laying down, never in 
the standing position) and all fastened together with the fastening pieces. For fastening lengthwise as 
well as widthwise, at least two fastening pins are required in each direction. When the system is to be 
built  in  several  levels,  then  the  individual  layers  must  be  arranged  both  lengthwise  and  crosswise 
(widthwise)  to  one  another  to  ensure  a  stable  interconnection.  Before  filling,  the  module  must  be 
completely wrapped in  the  Geo-textile  and special attention must be paid to  ensure  that all the ends 
and edges of each fleece roll overlap by at least 30-50 cm. To conclude the installation, the excavation 
is evenly backfilled and compacted. The terrain of the ground surface and substructure should be the 
expected  load  to  be  prepared.  If  it  is  intended  that  grass  should  be  sown  over  the  GRAF  drainage 
blocks, then a heavy duty plastic sheeting should first be laid over the drainage blocks and this then 
covered by an approximately 10 cm thick layer of clay otherwise the grass will dry out too quickly. 

 

Otto Graf GmbH 

Carl-Zeiss-Straße 2-6 

D - 79331 Teningen 

Tel: 0049/(0)7641/589-0 

Fax: 0049/(0)7641/589-50 

www.graf.info 

info@graf.online.de 

 

Stand: 12/2010 

 
 
 

Graf Distribution SARL  

45, Route d´Ernolsheim 

F - 67120 Dachstein-Gare 

Tel: 0033/388497310 

Fax: 0033/388493280 

www.graf.info 

info@graf.fr 

 

Version : 12/2010 

 
 
 

Graf IBERICA Tecnología del Plástico S.L. 

Sant Miquel 37 (Ver Situación) 

ES – 17003 Girona 

Tel: 0034/972913767 

Fax: 0034/972913766 

www.graf.info 

info@grafiberica.com 

 

Versión: 12/2010 

4. Installation

 

Page 8 of 8 

Summary of Contents for 300

Page 1: ...ctions enclosed in the transportation packing Any missing instructions must be requested directly from us A complete check of the tank for possible damage must be carried out before the installation in the excavation begins The installation must be carried out by a professional firm Graf drainage block 300 lorry Order Nr 360014 Graf drainage block 300 lorry inspect Order Nr 360015 Graf drainage bl...

Page 2: ...uct a complete system The use of other manufacturers accessories can impair the function of the system and liability for any resulting damages will no longer be covered under the guarantee Volume Gross 300 Litre Net 285 Litre Length 1200 mm Width 600 mm Height 420 mm Connections 12 x DN 150 6 x D 125 6 x DN 100 Weight Rain Bloc car 15 5 kg Rain Bloc car inspect 16 5 kg Rain Bloc lorry 17 5 kg Rain...

Page 3: ...uration Max 3 5 t m Max 5 0 t m max Earth covering 2000 mm 2750 mm max Installation depth 3500 mm 5000 mm Light traffic and without traffic loads max Number of layers 7 layers 10 layers min Earth covering 250 mm 250 mm max Earth covering 2750 mm max Installation depth 5000 mm HGV 12 max Number of layers 10 layers min Earth covering 500 mm max Earth covering 2500 mm max Installation depth 5000 mm S...

Page 4: ...sure a stable interconnection Before filling the module must be completely wrapped in the Geo textile and special attention must be paid to ensure that all the ends and edges of each fleece roll overlap by at least 30 50 cm To conclude the installation the excavation is evenly backfilled and compacted The terrain of the ground surface and substructure should be the expected load to be prepared If ...