background image

allation

5 Domestic 

8 Commerc

Sewage Sy

nts describe

ns must be 

mstances. A

re invalid in

servance. S

tructions an

ed in the con

 instruction

d from us im

k must be c

e prior to ins

mstances. 

 instruction

on www.gra

ed from GR

te instructio

on and main

supplied in 

n instruc

cial 

ystems 

ed in these 

observed u

All warranty

n the event o

Separate ins

nd manuals 

ntrol cabine

s must be r

mmediately. 

checked for

stallation un

s can be do

af.info or ca

RAF AU. 

ons for start-

ntenance of

control cab

 

ction fo

 

 

in-

under 

of 

stalla-

are 

et. 

re-

r any 
nder 

own-

an be 

-up, 

f the 

binet.

 

 

C

1

2

3

4

5

6

7

 

   

 

or Graf E

system

Contents

 

Genera

1.

 

Dimens

2.

 

System

3.

 

Assemb

4.

 

Assemb

5.

 

Commis

6.

 

Notes

7.

EPro wa

l

sions

 design

bly of tank c

bly of switch

ssioning

astewat

components

h cabinet

ter treat

 

tment 

2

3

4

6

13

24

25

3

4

5

Summary of Contents for EPro Series

Page 1: ...ved u All warranty n the event o Separate ins nd manuals ntrol cabine s must be r mmediately checked for stallation un s can be do af info or ca RAF AU ons for start ntenance of control cab ction fo in under y of stalla are et re r any nder own an be up f the binet C 1 2 3 4 5 6 7 or Graf E system Contents Genera 1 Dimens 2 System 3 Assemb 4 Assemb 5 Commis 6 Notes 7 EPro wa m l sions design bly o...

Page 2: ...hout ca ventilation f mmended A bstructed dra 1 Gener 2 25 ollow the dir er informatio et lines r treatment s d be situated tion so that a ausing any p flue effect T Additional ve ain ral rections in th on on the ins system some away from l air blown into problems Th The vent outl entilation line he enclosed stallation con e odour can a iving areas o the tank by he ventilation et height sho es or ...

Page 3: ...ydraulic load Htot 215 d L B Ht I A I 100 B 5 340 2 Epro 1 L 2 B 1 tot I A L 2 Dimensi 3 25 o15 Domestic 4800 L 10 1500 L d 2280 mm 1985 mm O ions c E Co 6 18 23 21 5 500 Epro18 mmercial 6500 L 10 800 L d 390 mm 190 mm 595 mm 1655 to irrigation infiltration system ...

Page 4: ...Well 9 Chlorine Tab A E ign Mini ion ation binet Poly 00 l blet Feeder C 3 F System d 4 25 J K L M N O P Q R H O esign Irrigat Highle Pump Intern Air Di Cabin 100 m Appro Excav G H N P Q tion Pump evel Alarm F p Platform nal Alarm Pla ffusor net Ventilatio mm Compact oved Backfill vation K J I M C D L R Float ate on Fan ted Base Ma aterial ...

Page 5: ...tional Sapphire 900 L tank EPro15 Two with effluent pump in additional Sapphire 900 L tank EPro15 Three w o additional tank Outflow free slope EPro15 Three O according to EPro15 Three but with additional effluent pump inside the treatment plant Figure 1 Epro15 One Figure 2 Epro15 Two Figure 1 Epro15 Three Figure 2 Epro15 Three O ...

Page 6: ... overfl 83 mm in the VC fittings as ne ed is screwed g washers sh n by the clea e is on the s ane is shown 800 L x 800 t ber bly of tank 6 25 o instruction flow top part of b s shown in dr d on to the b hould be use ar water lifter ide where th n in the draw 2 cha black PE membrane k compone manual Bef baffle as show rawing affle 2nd cha ed The mem r During the he PE membr wing EPro18 wit 2nd ambe...

Page 7: ...mm is le on the end 00 L 0 mm 4 Assemb at 4 800 L x 800 n pipes are t required for d faces of the 3750 L 150 m H bly of tank 7 25 to be drilled drilling e tank can be L m black PE membrane k compone EPro18 C wit in all tanks e found in th 4800 L 230 mm e ents Commercial th PE sheet 6 and fitted w e table below O Carat 6 600 x 1000 with GRAF D w 6500 L 250 mm 500 L DN 100 edge e ...

Page 8: ...low 110 pipe a installed fro readed rod d eration unit nless steel pi o be sealed iffuser hand 5 Ins t w pipe and bow can om the insid drill with a 9 pes using Teflon tight stallation s 8 25 n be grey de to the F e 9 mm drill T n tape Do set up kit For fixing dra ed stud and t The pipe is fix not allow wa ain pipe DN two nuts are xed by threa ater to enter 100 pipe cla required aded bolt and the v...

Page 9: ...ss steel d r water lifter ping a clea rcial the two wnpipe with a f the aeratio downpipe is rly audible c 5 Ins o disc aerato a Y piece on unit to th inserted into lick sounds stallation s 9 25 ors are he set up kit o the clamps set up kit s provided b between the excess slud dge lifter and d ...

Page 10: ...m f drain U B d on the clea p kit and slee th a screw on 5 Ins up kit iddle of the b end ar water lifter eve connect n the baffle stallation s 10 25 baffle Disc a r The outflow tions set up kit aerator must w of the U be All loose drilling s be installed end must lea e pipe conne screws on side of ou ad into the dr ections must utflow rain pipe be fixed with h ...

Page 11: ...gromm connected to een air hose charge of su first critical fl stallation s 11 25 pty pipe Col mets on the s o the stainle is used for th uspended so ushing surge set up kit lored hoses set up kit ss steel dow he patented lids is enorm e C u have to be c wnpipe There air barrier mous reduced Colored mar up kit connected a e is no color d rking at the nd fixed with marking EPro set h ...

Page 12: ...ts Chlorine Tab High Water L rrigation Pum A of Sapphire blet Feeder Level Alarm F mp B 5 Ins e disinfectio Float C stallation s 12 25 on as option D E D set up kit n and pump Press Lip Se D p out tank sure Pipe 40 eal DN50 E mm ...

Page 13: ... A B C D f switch ca ompressor KL24plus h Step Motor m Unit d installatio location for t se to the trea dy as possib 6 Assem abinet Valves on the cabinet atment tanks ble mbly of sw 13 25 E F G Mind given witch cabin Coolin Powe Remo Alarm length of air net ng Fan er Supply ote Alarm Pla m LED not fig r hoses 5 me E F G ate gured eter and cab E bles ...

Page 14: ...Pro1 0 mm mm 0 mm mbly of sw 14 25 15 witch cabin Plastic ca Assemb accordi L W Dep net binet for EP ble bottom p ng to instruc Excavati ength approx Width approx pth approx 6 Conduit 900 5 845 300 Pro18 Comm part and fix to ctions include ions x 585 mm x 315 mm 600 640 mm pipe 585 Insta 600 mercial o top part ed allation depth 640 ...

Page 15: ...ly of sw 15 25 15 ralian nd ck to it pipe 100m y gases from AF sealing ca duit pipe witch cabin Plastic ca Can g Make upright Filling filling granula soil wh in long to be re mm DWV PVC m transfering ap at the cab net abinet for EP Electric c go directly in through ope Filling sure cabine t before filling up the insid granulate ate reduces hich can lead run The gr eplaced C Make sur from treatm bi...

Page 16: ...ir lifter 6 Assem side of the s move this plu th ends acco el lack white mbly of sw 16 25 sealing Pus of m ug Pus tigh ording their c red blu bla wh witch cabin sh the hoses material rema sh the sealin htly colour code d hose 13m ue hose 19m ack hose 13 hite hose 13 net s through th ains stuck in g cap into th m mm 3mm 3mm e thin top la n the end of t he conduit pi ayer A plug he hose pe to seal i...

Page 17: ...be ternal Alarm er Plug C in E F 6 Assem KL24plus n pump Plate king for float st be installed nput A with to Power O l pump wor set on maxi Plate to Rem nto the cabin D mbly of sw 17 25 F G H I switch d inside the E h alarm outp Output B rking level flo mum 10 min mote Output nets power s witch cabin Work Acces alarm Pump Statu EPro Control put plug X1 5 oat E n t D supply C net load option ssory ...

Page 18: ... m nting alarm p 6 Assem Remote al cable should ce ate at a place move the Pow late to the w J mbly of sw 18 25 b larm plate be run in a e where oper wer Bridge J wall J2 witch cabin back separate co rator can eas J2 on the b net onduit to the sily hear and ack from on system pow d see it ne pin to brid wer supply to dge two pins o ...

Page 19: ... th 6 mm 108 1 Carat Carat Concr XXX min le float s lear Water odule as o he pump 116 mm 124 4800 10 EP 6500 10 EP rete 10 EP X mm evel when switch off r Pump M 19 25 option The br the swi 4 132 mm odule as rackets shou itch off point 157 162 mm option uld be set w of the pump m with due con p used sideration of f ...

Page 20: ...7 2 M 7 3 St ounting the train relief 7 Cl e brackets lear Water r Pump M 20 25 odule as option ...

Page 21: ...7 4 Lo 7 5 In The clea ower pump nstallation in ar water mod 7 Cl socket and n the tank dule is hung u lear Water clip mounti up on the pa r Pump M 21 25 ing rtition baffle odule as option ...

Page 22: ...d on with b nnection for d to the plu aptor The c green 3 pin p nto the contro h both screw The black EU nto the free lear Water r clear water Ampere can both screws o r clear water ug in couplin cable which plug connecto ol system X3 ws on the le U power plu socket of th r Pump M 22 25 r pump up t connected d on the left an r pump mor ng is or 3 eft ug he odule as o 2A directly to th nd on the ri...

Page 23: ...scharging 3 12 12 T 10 min on 0 0 T 11 min off 1 1 T 12 sec Sludge return 4 T 13 min break of cycle off 2 T 14 min break of cycle on T 15 min Holiday on T 16 min Holiday off T 17 min total cycle time shall be less than 360 T 18 min total aeration time T 19 min Total running time Duty cycle UV module 12 12 T settings can be found in menu duration period setup and UV settings in UV light unit setup ...

Page 24: ... up and don ts Commissi 24 25 in this install water other evel is approx ply double ry Alarm Con control unit in 18 Commerc ws Set Date nter the corre on Area and 0 button Y ts are workin h ESC e and will cou operation ioning lation instruc rwise no test x 20 cm belo socket licen ntroller into th nto Power su cial you have e and Time ect date and test all valve You should ng and aera unt down in a...

Page 25: ...otes 9 Note 25 25 www graf info s o 2017 07 7 ...

Reviews: