5. Control and machine cabinet
17 / 54
A cabinet made from facing concrete is needed for a compressor size of DT 4.16 or more. This
requires a concrete foundation (foundation plan available from GRAF).
Figure 1: Inside of two-door concrete cabinet
Figure 2: Two-door concrete cabinet
When starting up the system (i.e. once assembly is complete), all chambers should be filled up
to the bottom edge of the discharge if this hasn't been done already.
Caution:
Because the sludge reservoir and SBR reactor do not communicate with one another,
they must be filled individually.
Starting up the cabinet
5.3
Once the system has been connected to the power supply, it performs a quick self-test (if the
control cabinet has a main switch, it should be in position "1"). This test takes a few seconds,
then the system automatically enters normal operation (automatic). During the self-test the
words "SYSTEM TEST ... OK", the program version and the control unit's serial number are
displayed briefly. The system's current operating mode is then displayed in the liquid crystal
display. If a battery has not yet been placed in the control unit and the time and date have not
yet been set, the control unit will display fault messages. These can be acknowledged using the
Esc key. The time and date can then be set via the menu (see below).
The function of the control unit, three lifters, aeration and if present the cabinet fan should then
be checked. This can be done via the Manual operation menu item in the control unit.
Please note:
The lifters will only work if the tanks are filled.
If the time and date are not set correctly, operating faults are saved with the
wrong times.
The system should be reset to automatic mode once the test is completed successfully.