Starting up the control unit
4.4
Once the system has been connected to the power supply, perform a brief system test. The system test
takes a few seconds and checks the real-time buffering. During this time, the LED lights up red. Then the
LED switches to green and the start phase is complete. During the system test the words "SYSTEM TEST
... OK" appear. The program version and the control unit's serial number are displayed briefly. The sys-
tem's current operating mode is then displayed in the liquid crystal display. Once the system test is com-
plete, the date and current time should be checked and adjusted if necessary.
After checking the date/time, the function of the installed parts should be checked. The check can only
take place as soon as the installed parts are connected to the control cabinet via the air hoses needed.
The check should be carried out via the "Manual operation" menu item in the control unit. The individual
installed parts should be activated and checked in turn.
The system should be reset to automatic mode once the check is completed successfully.
PLEASE NOTE
: The clear water lifter will only work if the tanks are filled.
If the time and date are not set correctly, operating faults are saved with the wrong times.