5. Start-up
When starting up, the functionality of the small wastewater treatment system is checked by means of a
test run. The start-up also includes setting the control unit and instructing the operator.
Preparations
5.1
Before starting up, the following should be ensured for correct operation:
The switch cabinet and installed parts must not be damaged in any way.
The connections (inlet and outlet) should be established correctly (no mistakes).
Lines (air hoses) must be routed and used in the empty pipe as specified.
The aeration and ventilation function must be checked (smoke cartridge test)
All installed parts (aeration, lifter and sampling tank) must be checked.
The switch cabinet must be installed and the electrical connection established.
The tank's seal integrity should be checked.
Test run
5.2
The system must be filled with water for the test run. The system must be filled to at least 10 cm above
the minimum water level so that the lifter's intake connection is covered with water.
The test run is undertaken by the system's control unit. This requires the system to be switched on after
filling via the two pin plug.
The system is now ready and runs fully automatically.
System test
When the control unit is switched on, a system test is performed automatical-
ly. The system is powered up and the serial number displayed.
System test
set time
A note indicating that the time should be set then appears. This note only
appears during the first system test. If the control unit was previously
switched on before the first start-up, this note does not appear.
HH:MM:SS
2013-31-01 Mo
Press
, then press the arrow keys
until the "Time / date" screen
appears. Again pressing
allows the time and date to now be set in turn
using the arrow keys
. To confirm each change, you must press
.
Pressing
takes you back to the menu.