LX_FR565G-INS-LAB-RevD21 6
UPHOLSTERED BACK ASSEMBLY
Info: To facilitate assembly, DO NOT remove
the wooden shipping support that is attached
to the recliner’s metal back frame until after
the recliner's metal back frame has been
assembled to the recliner frame.
1. Refer to illustrations at right.
2. Locate the upholstered back assembly.
Remove the upholstered cushion from the
metal back frame.
3. Remove the clevis pins and ring cotter
pins from back frame (one on each side).
4. Slide the back tubes onto the receiving
tubes on recliner frame and tap down until
holes in back frame line up with holes in
the recliner frame.
5. Replace clevis pins and ring cotter pins.
Remove the wooden shipping support and
discard.
6. Slide the lower elastic band on back
frame downward to cover the clevis pins.
Position other straps evenly on back
frame.
Info: The 2" elastic bands can be adjusted
for custom patient comfort. By repositioning
the bands you can increase or decrease the
amount of support anywhere along the back.
7. At the bottom of the upholstered back
cushion you will find two elastic straps
with key rings on the ends (one on each
side). Replace back cushion over metal
back frame and secure to the recliner
frame with the rings attached to the
elastic straps. Hook the rings over the
buttons on the recliner frame.
elastic
band
wooden
shipping
support
clevis pin
ring cotter pin
receiving tube
Back Assembly 1
frame
key ring
strap
hook
Back Assembly 2
Back Assembly 3
upholstered
back cushion