9/24
GrainPro® Cocoon™ Cargo Instruction Manual
MA4042TSD1014-3
Rolling method
Use of forklift
Use of conveyor
5.3.2.
Unfold the top section over the stack. Make sure that top and bottom section arrows are aligned and
the tension straps are outside.
5.3.3.
One pair of arrows is painted green. Match these arrows for correct front and back orientation of the
Cocoon.
5.3.4.
Pull the sides covering the entire pile.
NOTE: Do not use tensions straps to pull or carry the top section.
5.3.5.
Use silicon spray in closing the Cocoon with zipper pull.
5.4.
USE OF DESICCANT (CALCIUM CHLORIDE, CaCl
2
) – (Recommended)
5.4.1.
Required dosage of Calcium Chloride, CalCl
2
:
5.4.2. Place the desiccants (Calcium Chloride, CaCl
2
) at the middle-top portion of the bags inside the
Cocoon Cargo before zipping.
5.4.3. For six (6) months of storage, spread-out the desiccant packs on top portion of the bags inside the
Cocoon Cargo before Zipping.
COCOON CARGO
Desiccant Require (CaCl
2
) for
1 month of Storage
Desiccant Required (CaCl
2
) for
6 months of Storage
grams
grams
GP Cocoon Cargo
300
1800
5.5.
ZIPPING
5.5.1.
Preparing to zip:
a.
Insert one hand inside the inverted pocket
and engage the zipper track of the top and
bottom liners by pressing the zipper.
b.
Manually close the zipper track to a length
of 10 cm before using the zipper pulls.
NOTE:
There are zipper pulls that zip to the right for right-handed users *marked with “RIGHT”+ and
zipper pulls that zip to the left for left-handed users *marked with “LEFT”+.
5.5.2.
Engaging the zipper pull:
a.
Open the zipper pull by moving the black
plastic handle, projecting the large wheel
away from the flexible pulling loop.