11/18
GrainPro®
GrainSafe™
Bag-1.0 Instruction Manual
MA4010RLR1009-6
8.1.5.
Required capacity:
a.
Keep the sacks stable by loading the
succeeding layers in a crisscross manner.
b.
Continue piling until the desired GS Bag-
1.0 height is reached.
8.2.
ZIPPING
8.2.1.
Preparing to zip:
a.
After the GS Bag-1.0 has been filled to
its recommended capacity, position the
hermetic zipper flat on top of the stack.
b.
Make sure that the zipper tracks are
free from dirt so that the zipping can be
done properly.
8.2.2.
Using the zipper pull:
a.
Starting from the end of the zipper,
place the smaller black running wheel
inside the liner facing upward to lock
the bottom liner zipper track.
b.
Place the larger wheel outside the liner
facing upward to lock the top liner
zipper track.
c. Rotate the zipper
pull’s
plastic handle
180° toward its pulling loop, forcing the
tongues and grooves of the two zipper
tracks together.
d. Slide the zipper pull to the other entire
length of the zipper track.