10/37
GrainPro® Solar Bubble Dryer™50 Instruction Manual
MA4040RAD0914-9
c.
Ventilator
support clamp,
Two (2) pieces
3)
Assemble the ventilator support legs (e)
using bolts and winged nuts (f) using the
screw driver provided.
4)
Position the ventilator support legs under
the sand bags (fill in the provided sand bag
first and fold the other part under it). Sand
bag is located along the heating area
extension of the drying floor.
5)
Connect the ventilator to the SBD50 body.
Make sure that the direction of airflow is
correct (see the arrow printed on the
ventilator).
d.
Horizontal brace,
Two (2) pieces
e.
Ventilator
support legs,
Four (4) pieces
f.
Bolts and winged
nuts,
Four (4) sets
g.
Hex nuts,
Four (4) pieces
5.2.3.
SBD Solar panel and support assembly:
COMPONENT
IMAGE
SEQUENCE OF ASSEMBLY
a.
Solar panel,
Two (2) units
1)
Assemble the brackets at the top and
bottom side attaching the two (2) solar
panels.
b.
Bracket,
Two (2) pieces