GrainPro® Solar Bubble Dryer™50 Instruction Manual
MA4040RAD0914-9
b.
Connect the grounding wire (green/ yellow green) with ring terminal to the ventilator frame and fix
the other end with peg to the ground.
c.
If the area is cemented, lay the peg on the cement and put a heavy object over it, like stone, to
have SBD50 grounded.
GROUNDING CONNECTION DIAGRAM
5.4.
WIRING CONNECTION AND ELECTRICAL SAFETY FOR SBD50-ELECTRIC
5.4.1.
Ventilator Connection
Every AC ventilator has its own plug. To run the ventilator, just connect them to a 220V electrical
outlet. If the outlet is rated 110V, use the ‘step-up transformer’ to convert 110V to 220V. A 10-meter
extension cord is provided with the SBD50-Electric. Use a longer extension cord if needed. Be careful
to avoid possible grounding.
5.4.2.
Grounding Connection
Make sure to connect the grounding wires (green/ yellow green) from the ventilator to the ground by
pushing the peg into the soil. If the area is cemented, lay the peg on the cement and put a heavy object
over it, like stone, to have SBD50 grounded.
5.5.
LOADING
5.5.1.
Unzip and open one side of the dryer before
loading the agricultural commodity.
NOTE:
Loading requires at least two persons.
5.5.2.
Place the bagged commodity onto the drying
floor and spread evenly on the designated
drying area (2m wide).
NOTES:
The SBD is not designed for drying of
"dripping wet" commodities. In those
cases, commodity needs to be sundried
and final drying (<30% MC) can be (dried)
performed in the SBD
.