12
STEP T
W
O
S04
ML01
604-R
619
601A-FL
601A-FR
604-R
604-L
619
INSIDE DOOR FRAME
GRANDIO
T I P
BOLT INSTALLATION TIP:
Locate all nuts and bolts, pre
thread and place in the groove of the
extrusion to make installation easier. Move
up or down for exact placement.
A
TIP:
If necessary
you may use a screwdriver to wedge behind the
bolt head. This prevents bolt from falling into the track.
S04
601A-FR
ML01
619
2.5
View diagrams and attach the (2)
604‘s
and (2)
601A’s to the 619 with the S04/ML01 nut and bolt
combos. Note the orientation of the 601A-FR and
601A-FL and the holes that should be at the top of the
piece and face to the front, see the diagram to the right.
shows where the corner pieces attach to 619.
shows where the door frame attaches to the 619.
INSIDE
Inside View
Inside View
INSIDE
OUTSIDE
INSIDE
OUTSIDE
INSIDE
OUTSIDE
OUTSIDE
INSIDE
GRANDIO
T I P
Make sure the hole on the
601A-FL and 601A-FR
face to the front of greenhouse for future of
the L21 and L28 bracket that holds the
door header in place.
NOTE HOLES
ON 601A SHOULD
FACE FRONT OF
GREENHOUSE
FRONT FRAME ASSEMBLY CONTINUED
ALWAYS ASSEMBLE FRONT HORIZONTAL
Summary of Contents for Ascent 8x8 KIT
Page 46: ...NOTES NOTES 45...