8
STEP ONE
1.2
Slide the BA-C3 into the BA-S1, slide the BA-S2 into the BA-C3, align the holes and push together to an even and tight
position and use the BA-S03 bolt and BA-M03 collard nut combo, tighten the collard nut on the inside of the base kit using the
10mm wrench or nut driver. Repeat this process on all corners. See and .
Note: Placement of BA-S1 will be at front and the back, while the BA-S2’ s will be the sides of your greenhouse base.
1.3
For ground installation only insert the (4) BA-A1’s and (4) BA-S03/ML01 combos to the four corners as shown in .
When all of the BA-A1’s are installed you can adjust the bolts to level the base. If you are installing on a flat mount surface see
page 9.
BASE KIT ASSEMBLY INSTRUCTIONS
BA-S1
BA-S2
FRONT
SIDE
BA-C3
BA-A1
BA-S03
ML01
BA-C3
BA-S1
BA-S2
BA-S03
BA-M03 Collared Nut
BA-S03
BA-M03 Collared Nut
BA-A1
BA-S03
Summary of Contents for Ascent 8x8 KIT
Page 46: ...NOTES NOTES 45...