background image

4.8

 Before you attach the 609 you will need to 

loosen the ML01 (nut) attached to the L08C-X 

tops. Note: Loosen nuts on only one side at a 

time, i.e. right front corner, right rear corner. 

See       . 

With 2 people proceed to install 609 in 
this order, note that 609 must be installed 
with groove side down see       . 

1. With one person holding the 609 level and in 

position have the other person attach the 609 

to the 601B using S04/ML01 (nut and bolt). 

See       .

2. Now move the loosened S04/ML01 (nut and 

bolt) currently attached to the 601A upward to 

firmly secure the L08C-X, 609 and 601A 

together as shown in       .

3. Repeat steps 1 and 2 for the other end of 609.

4. With one side firmly secured move to the 

other side and repeat steps 1, 2 and 3.

MIDDLE ASSEMBLY CONTINUED

L08D OR

L08B

L08C-X

601A

609

L08C-X

GRANDIO

T I P

Remove only one L08C-X 
at a time. If all L08C-X’s 

are removed, the structure will collapse 
and cause unwarrantable damage.

601B

609

S04/ML01

L08C-X

L08D OR

L08B

LOOSEN

ML01

21

STEP F

OUR

Inside View

Inside View

609

Profile View

Groove

Summary of Contents for ASCENT GRA-812-GR

Page 1: ...G R E E N H O U S E S GRANDIO GREENHOUSEUSERMANUAL Model GRA 88 GR Shown In Image 2013 Grandio Greenhouses Backyard Living Source Inc All rights reserved Model GRA 812 GR GRANDIO 8X12 ASCENT...

Page 2: ...sure your Grandio Greenhouse will be covered on your policy Call your local utilities companies before digging Do not attempt to begin construction on a windy day Your greenhouse should be built on a...

Page 3: ...ely after the construction is completed Clear lm side of panels should always face the sun and opal lm side faces inside Due to shipping the grooves of some of the aluminum profiles may be too small t...

Page 4: ...est protected from wind and storm conditions Go to www grandiogreenhouses com for founda tion ideas and tour our online learning center for tips and tricks for putting your greenhouse together GRANDIO...

Page 5: ...L08C 602B 602A 602A 602A 602B L08C 603C 616 602B 618 L08C X L08C X 615 RIGHT SIDE 603C 616 602A 602A L08C X 618 602B L08C 602B 610 602A L08C X 602B L08C L08C 615 4 603C 603C 603A 603B 603B 610 610 8x1...

Page 6: ...ASSEMBLY INSTRUCTION STEPS STEP ONE BASE ASSEMBLY STEP TWO FRONT ASSEMBLY STEP THREE BACK ASSEMBLY STEP FOUR MIDDLE ASSEMBLY STEP FIVE DOOR ASSEMBLY G R E E N H O U S E S GRANDIO 5...

Page 7: ...cut for patio or deck installation Drill holes in bottom of base to allow for proper fastener to pass through prior to moving forward with assembly You determine and aquire proper fastener prior to in...

Page 8: ...2 W02T W02T W01 W04 GRANDIO T I P Lay flat on ground to assemble the front frame of your greenhouse If possible try to find a shady area protected from the wind Panels can burn grass and plants if in...

Page 9: ...in Pre thread all fasteners for ease of installation 2 2 Insert Y3 1 and Y3 2 window panels as shown in 2 3 Attach 603E and 603D with W04 and S04 ML01 fasteners as shown in 2 4 Attach W02T to 601B and...

Page 10: ...to wedge behind the bolt head This prevents bolt from falling into the track S04 601A FR ML01 619 2 5 View diagrams and attach the 2 604 s and 2 601A s to the 619 shows where the corner pieces attach...

Page 11: ...2 9 Attach W02 s to end of 601B s with the S05 screws as shown in L08D L08D L08D Y2 Y1 604 L 604 R 619 606 606 601A FL 3 in Polycarbonate panel 603D 601B 603E 601B Y3 2 Y3 1 604 R Y 2 Y 1 W02 W02 601...

Page 12: ...same tighten L08X s to hold squareness L08A X should be attached 1 up from bottom bolt see 601B L08D L08A X 601B Y3 2 603E L08D L08A X 604 R 601A FR 601A FL Y3 1 Y1 Y2 604 L 619 W02 W02 W02T W02T 603D...

Page 13: ...TION TIP Locate all nuts and bolts pre thread and place in the groove of the extrusion to make installation easier Move up or down for exact placement Inside View GRANDIO T I P Make sure the UV coated...

Page 14: ...A using S04 ML01 fastener as shown in diagram Attach 2 603B s to L08A using S04 ML01 fasten ers as shown in diagram Attach 603A to L08A using S04 ML01 fastener as shown in diagram 603B 603A 601A B 603...

Page 15: ...S04 ML01 fasteners as shown in diagram Attach L08B to 2 603B and 603A with S04 ML01 fasteners as shown in and pre thread all fasteners into assigned channels and align with L08B for ease of installati...

Page 16: ...05 fasteners as shown in diagram and pre thread all screws for easiest installation tighten when flush with frame and square 603A 601A B 601A B ATTACHING ROOF TO BACK FRAME Y5 1 Y5 2 Y1 Y2 Y4 Y4 W01 6...

Page 17: ...s to 2 603B s and L08A with S04 ML01 as shown in C Attach 2 L08B X s to the 2 601A s with fasteners as shown in L08B X L08B X GRANDIO T I P Square by loosening bolts attached to the tops of the L08B X...

Page 18: ...g the front or back sections vertical must continue to do so until the L08C X angle supports are attached securely to the front and base as shown in step 4 5 Failure to hold front vertical will cause...

Page 19: ...and attach the L08C s to the front section as shown in Using tape temporarily attach the loose end of the L08C s to the base kit as shown in W05 MIDDLE ASSEMBLY CONTINUED Tape Masking Tape Base L08C...

Page 20: ...shown in Repeat steps for other side The L08C X braces will hold the front up vertically without assistance 4 6 To install the back section repeat steps 4 1 4 5 Remove tape from L08C s L08C X 601A B L...

Page 21: ...ge to front and back by sliding into place as shown in and using S04 ML01 fasteners attach the 607 to the 601B s MIDDLE ASSEMBLY CONTINUED 607 607 607 601B 601B 601B Inside View Side Angle View 20 STE...

Page 22: ...4 ML01 nut and bolt See 2 Now move the loosened S04 ML01 nut and bolt currently attached to the 601A upward to firmly secure the L08C X 609 and 601A together as shown in 3 Repeat steps 1 and 2 for the...

Page 23: ...des of the greenhouse in this order 1 Hold the 602A in place as shown and attach the top of the 602A to the 609 using S04 ML01 nut and bolt As shown in 2 Now attach the bottom of 602A to the L08C and...

Page 24: ...ach remaining 602B s to roof until roof vents are installed 4 11 Assemble the roof window vents as shown below Y9 616 615 Y9 618 Z02 Z02 Z02 Z02 Z02 618 Screwdriver SUN 616 615 PC sheet MIDDLE ASSEMBL...

Page 25: ...port do not place near the front or back Place directly across from each other for best cross draft ventilation see for optional placement 4 13 Attach all remaining 602B s after roof vents are positio...

Page 26: ...in 4 15 Attach HQC01 to 616 with the screws see close roof vent and attach the handle onto HQC02 middle pin the first two holes of the handle to the first two holes of HQC02 Then attach HQC02 to 603 w...

Page 27: ...t Y7 s 4 17 After Y7 s are installed loosen bolts attached to L08C X in all upper corners Using a level adjust 602A and tighten bolts Repeat in every corner until the greenhouse is level The top edges...

Page 28: ...to prevent sliding as shown below once the panels are in place Y8 Y8 Y10 Y8 27 STEP FOUR GRANDIO T I P Make sure the UV coated side of the panel faces outward as indicated on the panels Avoid placing...

Page 29: ...after gutter is fully installed Attach 609 window seals to the inside of roof after all panels and gutters are in place proceed to install both sides of the eave and ridge as shown in and 28 STEP FOUR...

Page 30: ...n adhesive into the ends of ridge 607 to secure pressure fit end caps 601 Adhesive not included It is recommended to caulk any areas that may allow water penetration such as at the gutter end caps and...

Page 31: ...MBLY 623A Z01 Z01 Z01 J08A J04 Z01 Z01 622 622 Z01 J08A Y6 Y6 623B 622 R UP UP Double Ball Catch GRANDIO T I P Pay close attention to 622 orientation during assem bly 2 of the 4 622 s will have holes...

Page 32: ...door track with door header move bolts on L21 to line up with bolt holes on door header 603B From the inside attach the S02 nut and bolt set and tighten while holding firmly as high as possible in pos...

Page 33: ...s on the bottom track are catching or dragging you may need to adjust the height by turning the screw shown in 5 4 Attach the door handles 622 HNDL to both doors using the 622 HNDL NUT BOLT provided t...

Page 34: ...tach L28 to L21 and 601A as shown below in diagram and Attach 2 J07 to the ends of L21 see 5 6 Remove all plastic film from polycarbonate window panels immediately J07 603A L21 L28 S04 ML01 Top View 6...

Page 35: ...m with the ML01 S04 Use CZ1 s to support the interior wall at the eave using the ML01 S04 See diagram 5 8 Use ML01 S04 to attach the L08C to 601B s and 602B s on the inside of roof midway between the...

Page 36: ...54 5 16 SIDES 1 1 1 1 4 4 2 2 2 2 2 1 2 2 4 PARTS NO 601A FR 601A FL 601A B 601B 602A 602B 603A 603B 603D 603C 603E 604 R 604 L GREENHOUSE MODELS ALL MODELS ALL MODELS ALL MODELS ALL MODELS GRA 88 GR...

Page 37: ...RONT BACK FRONT ROOF ROOF BACK 2 PHILLIPS SCREWDRIVER 4X30 5X12 MM 5X12 MM 3X25 MM 2 4 2 4 4 8 2 4 2 5 9 2 1 13 9 17 4 Z04 S02 S03 M01 ML01 S04 S05 J601 J602A E J602B E BZ 1 CZ 1 GRA 88 GRA 812 ALL MO...

Page 38: ...MID BASE BACK PLATE BASE CLIP BASE CLIP 2 4 2 4 2 1 14 18 22 32 4 2 4 0 2 0 2 15 19 BLACK WINDOW SEAL W06 Y1 Y2 Y3 1 Y3 2 Y4 Y5 1 Y5 2 Y6 Y7 Y8 Y9 Y10 ALL MODELS ALL MODELS ALL MODELS ALL MODELS ALL M...

Page 39: ...ELS ALL MODELS ALL MODELS ALL MODELS ALL MODELS ALL MODELS ALL MODELS ALL MODELS ALL MODELS ALL MODELS ALL MODELS ALL MODELS DOOR HANDLES DOOR HANDLES 21 7 16 DOOR 95 1 2 DOOR 64 7 16 DOOR 64 7 16 LEF...

Page 40: ...MANUAL KEEP IN A SAFE PLACE FOR REFERENCE CONTACT US IF YOU NEED HELP OR HAVE MISSING OR DAMAGED PARTS GRANDIOGREENHOUSES COM BACKYARD LIVING SOURCE INC 9543 W EMERALD ST SUITE 101 BOISE ID 83704 1 86...

Reviews: