36
STEP F
OUR
609
610
Gutter
Outside View
601B
601A
610
4.19
Insert polycarbonate sheets Y8’s and Y9’s into the lower roof of your greenhouse.
Panels may slide out before gutters are in place. You may want to place a piece of tape on the
panel to prevent sliding as shown below once the panels are in place.
4.20
Slide 610 into 609’s groove as shown in diagram . Repeat on both sides. Remove
tape after gutter is fully installed.
Y9
Y8
Y8
Y8
609
MIDDLE ASSEMBLY INSTRUCTIONS CONTINUED
The two profiles should be flush
at ends when installed correctly.