background image

S04

ML01

604

619

FRONT FRAME ASSEMBLY

601A-FL

601A-FR

604-R

604-L

619

INSIDE DOOR FRAME

GRANDIO

T I P

BOLT INSTALLATION TIP: 
Locate all nuts and bolts, pre 

thread and place in the groove of the 
extrusion to make installation easier. Move 
up or down for exact placement.

A

TIP: 

If necessary

 

you may use a screwdriver to wedge behind the 

bolt head. This prevents bolt from falling into the track.

S04

601A-FR

ML01

619

2.5:

 View diagrams and attach the (2) 

604‘s 

and (2) 601A’s to the 619.

       
        shows where the corner pieces attach 

to 619

       shows where the door frame attaches 

to the 619

INSIDE

9

STEP T

W

O

Inside View

Inside View

INSIDE

OUTSIDE

INSIDE

OUTSIDE

INSIDE

OUTSIDE

OUTSIDE

INSIDE

GRANDIO

T I P

Make sure the small screw 
hole on the 601A face to 

the front of greenhouse for future of the 
L21 and L28 bracket that holds the door 
header in place.

Summary of Contents for GRA-ASC-812

Page 1: ...G R E E N H O U S E S GRANDIO GREENHOUSEUSERMANUAL Model GRA ASC 812 GRANDIO 8X12 ASCENT Model GRA 88 GR Shown In Image 2013 Grandio Greenhouses Backyard Living Source Inc All rights reserved...

Page 2: ...sure your Grandio Greenhouse will be covered on your policy Call your local utilities companies before digging Do not attempt to begin construction on a windy day Your greenhouse should be built on a...

Page 3: ...ely after the construction is completed Clear lm side of panels should always face the sun and opal lm side faces inside Due to shipping the grooves of some of the aluminum profiles may be too small t...

Page 4: ...st protected from wind and storm conditions Go to www grandiogreenhouses com for founda tion ideas and tour our online learning center for tips and tricks for putting your greenhouse together Transpar...

Page 5: ...L08C 602B 602A 602A 602A 602B L08C 603C 616 602B 618 L08C X L08C X 615 RIGHT SIDE 603C 616 602A 602A L08C X 618 602B L08C 602B 610 602A L08C X 602B L08C L08C 615 4 603C 603C 603A 603B 603B 610 610 8x1...

Page 6: ...ASSEMBLY INSTRUCTION STEPS STEP ONE BASE ASSEMBLY STEP TWO FRONT ASSEMBLY STEP THREE BACK ASSEMBLY STEP FOUR MIDDLE ASSEMBLY STEP FIVE DOOR ASSEMBLY G R E E N H O U S E S GRANDIO 5...

Page 7: ...ut for patio or deck installation Drill holes in bottom of base to allow for proper fastener to pass through prior to moving forward with assembly You determine and aquire proper fastener prior to ins...

Page 8: ...oise ID 83704 www grandiogreenhouses com FRONT FRAME ASSEMBLY INSTRUCTIONS This picture shows the inside view of front section fully assembled 601B L08D L08A X 601B Y3 2 603D 603E L08D L08A X 604 R 60...

Page 9: ...in Pre thread all fasteners for ease of installation 2 2 Insert Y3 1 and Y3 2 window panels as shown in 2 3 Attach 603E and 603D with W04 and S04 ML01 fasteners as shown in 2 4 Attach W02T to 601B and...

Page 10: ...edge behind the bolt head This prevents bolt from falling into the track S04 601A FR ML01 619 2 5 View diagrams and attach the 2 604 s and 2 601A s to the 619 shows where the corner pieces attach to 6...

Page 11: ...2 9 Attach W02 s to end of 601B s with the S05 screws as shown in L08D L08D L08D Y2 Y1 604 L 604 R 619 606 606 601A FL 3 in Polycarbonate panel 603D 601B 603E 601B Y3 2 Y3 1 604 R Y 2 Y 1 W02 W02 601...

Page 12: ...same tighten L08X s to hold squareness L08A X should be attached 1 up from bottom bolt see 601B L08D L08A X 601B Y3 2 603E L08D L08A X 604 R 601A FR 601A FL Y3 1 Y1 Y2 604 L 619 W02 W02 W02T W02T 603D...

Page 13: ...TION TIP Locate all nuts and bolts pre thread and place in the groove of the extrusion to make installation easier Move up or down for exact placement Inside View GRANDIO T I P Make sure the UV coated...

Page 14: ...A using S04 ML01 fastener as shown in diagram Attach 2 603B s to L08A using S04 ML01 fasten ers as shown in diagram Attach 603A to L08A using S04 ML01 fastener as shown in diagram 603B 603A 601A B 603...

Page 15: ...S04 ML01 fasteners as shown in diagram Attach L08B to 2 603B and 603A with S04 ML01 fasteners as shown in and pre thread all fasteners into assigned channels and align with L08B for ease of installati...

Page 16: ...05 fasteners as shown in diagram and pre thread all screws for easiest installation tighten when flush with frame and square 603A 601A B 601A B ATTACHING ROOF TO BACK FRAME Y5 1 Y5 2 Y1 Y2 Y4 Y4 W01 6...

Page 17: ...s to 2 603B s and L08A with S04 ML01 as shown in C Attach 2 L08B X s to the 2 601A s with fasteners as shown in L08B X L08B X GRANDIO T I P Square by loosening bolts attached to the tops of the L08B X...

Page 18: ...g the front or back sections vertical must continue to do so until the L08C X angle supports are attached securely to the front and base as shown in step 4 5 Failure to hold front vertical will cause...

Page 19: ...and attach the L08C s to the front section as shown in Using tape temporarily attach the loose end of the L08C s to the base kit as shown in W05 MIDDLE ASSEMBLY CONTINUED Tape Masking Tape Base L08C...

Page 20: ...shown in Repeat steps for other side The L08C X braces will hold the front up vertically without assistance 4 6 To install the back section repeat steps 4 1 4 5 Remove tape from L08C s L08C X 601A B L...

Page 21: ...ge to front and back by sliding into place as shown in and using S04 ML01 fasteners attach the 607 to the 601B s MIDDLE ASSEMBLY CONTINUED 607 607 607 601B 601B 601B Inside View Side Angle View 20 STE...

Page 22: ...4 ML01 nut and bolt See 2 Now move the loosened S04 ML01 nut and bolt currently attached to the 601A upward to firmly secure the L08C X 609 and 601A together as shown in 3 Repeat steps 1 and 2 for the...

Page 23: ...des of the greenhouse in this order 1 Hold the 602A in place as shown and attach the top of the 602A to the 609 using S04 ML01 nut and bolt As shown in 2 Now attach the bottom of 602A to the L08C and...

Page 24: ...il roof vents are installed 4 11 Assemble the roof window vents as shown below in and using the Z02 Screws attach the 615 616 and 618 s as shown Z02 SUN 616 615 PC sheet MIDDLE ASSEMBLY CONTINUED 602B...

Page 25: ...do not place near the front or back Place directly across from each other for best cross draft ventilation see for optional placement 4 13 Attach all remaining 602B s after roof vents are positioned S...

Page 26: ...as shown in diagram with the ML01 S04 Use CZ1 s to support the interior wall at the eave using the ML01 S04 See diagram 4 15 Use ML01 S04 to attach the L08C to 601B s and 602B s on the inside of roof...

Page 27: ...in 4 17 Attach HQC01 to 616 with the screws see close roof vent and attach the handle onto HQC02 middle pin the first two holes of the handle to the first two holes of HQC02 Then attach HQC02 to 603 w...

Page 28: ...arbonate sheet Y7 s 4 17 After Y7 s are installed loosen bolts attached to L08C X in all upper corners Using a level adjust 602A and tighten bolts Repeat in every corner until the greenhouse is level...

Page 29: ...to prevent sliding as shown below once the panels are in place Y8 Y8 Y10 Y8 28 STEP FOUR GRANDIO T I P Make sure the UV coated side of the panel faces outward as indicated on the panels Avoid placing...

Page 30: ...after gutter is fully installed Attach 609 window seals to the inside of roof after all panels and gutters are in place proceed to install both sides of the eave and ridge as shown in and 29 STEP FOUR...

Page 31: ...n adhesive into the ends of ridge 607 to secure pressure fit end caps 601 Adhesive not included It is recommended to caulk any areas that may allow water penetration such as at the gutter end caps and...

Page 32: ...DOOR ASSEMBLY DIAGRAM Z01 622 Y6 Y6 622 R UP UP Double Ball Catch 620 Z01 Z01 Z01 Z01 Z01 623B 623A 622 Side View 622 J08A Bottom View 623B 620 623A J08A J08A 622 L UP UP Side View 622 J08A Bottom Vie...

Page 33: ...nd 620 as shown in 5 3 Insert Y6 windows into position as shown in make sure to match doors up to each by laying out parts for other door now so window panels face the right direction to the sun and t...

Page 34: ...L and 622 R with the double ball catch match up so doors will latch closed and slide properly Y6 Y6 623B 623A 620 622 L Double Ball Catch Z01 Z01 Z01 622 Side View Of Top Double Ball Catch on the 622...

Page 35: ...door track with door header move bolts on L21 to line up with bolt holes on door header 603B From the inside attach the S02 nut and bolt set and tighten while holding firmly as high as possible in pos...

Page 36: ...622 HNDL NUT BOLT provided to both doors as shown below in and We included some felt dots in your Grandio Welcome Kit please apply to the inside bottom edge of the 623B as shown in these felt dots wi...

Page 37: ...ach L28 to L21 and 601A as shown below in diagram and Attach 2 J07 to the ends of L21 see 5 11 Remove all plastic film from polycarbon ate window panels immediately J07 603A L21 L28 S04 ML01 Top View...

Page 38: ...ACK 54 5 16 SIDES 1 1 1 1 4 4 2 2 2 2 2 1 2 2 4 PARTS NO 601A B 601A FL 601A FR 601B 602A 602B 603A 603B 603D 603C 603E 604 R 604 L GREENHOUSE MODELS ALL MODELS ALL MODELS ALL MODELS ALL MODELS GRA 88...

Page 39: ...RONT BACK FRONT ROOF ROOF BACK 2 PHILLIPS SCREWDRIVER 4X30 5X12 MM 5X12 MM 3X25 MM 2 4 2 4 4 8 2 4 2 5 9 2 1 13 9 17 4 Z04 S02 S03 M01 ML01 S04 S05 J601 J602A E J602B E BZ 1 CZ 1 GRA 88 GRA 812 ALL MO...

Page 40: ...MID BASE BACK PLATE BASE CLIP BASE CLIP 2 4 2 4 2 1 14 18 22 32 4 2 4 0 2 0 2 15 19 BLACK WINDOW SEAL W06 Y1 Y2 Y3 1 Y3 2 Y4 Y5 1 Y5 2 Y6 Y7 Y8 Y9 Y10 ALL MODELS ALL MODELS ALL MODELS ALL MODELS ALL M...

Page 41: ...ALL MODELS ALL MODELS ALL MODELS ALL MODELS ALL MODELS ALL MODELS ALL MODELS ALL MODELS DOOR HANDLES PACKED TOGETHER DOOR HANDLES 21 7 16 DOOR 95 1 2 DOOR 64 7 16 DOOR ALL PACKED TOGETHER 64 7 16 LEFT...

Page 42: ...MANUAL KEEP IN A SAFE PLACE FOR REFERENCE CONTACT US IF YOU NEED HELP OR HAVE MISSING OR DAMAGED PARTS GRANDIOGREENHOUSES COM BACKYARD LIVING SOURCE INC 9543 W EMERALD ST SUITE 101 BOISE ID 83704 1 86...

Reviews: