background image

35

STEP FIVE

5.10 

Attach L28 to L21 and 601A as shown 

below in diagram        and        . Attach (2) J07 to 

the ends of L21 see        . The L28 should align 

square to the 601A.

5.11 

Remove all plastic film from polycarbon-

ate window panels immediately at this step.

DOOR INSTALLATION

J07

603A

L21

L28

S04/ML01

Top View

601A

S02

 L28 

Summary of Contents for GRA-ELI88

Page 1: ...G R E E N H O U S E S GRANDIO GREENHOUSEUSERMANUAL 2013 Grandio Greenhouses Backyard Living Source Inc All rights reserved Model GRA ELI88 8x8 GRANDIO ELITE...

Page 2: ...be covered on your policy Call your local utilities companies before digging Do not attempt to begin construction on a windy day Your greenhouse should be built on a at level surface allowing for drai...

Page 3: ...otective film immedi ately after the construction is completed Clear lm side of panels should always face the sun and opal lm side faces inside Due to shipping the grooves of some of the aluminum prof...

Page 4: ...will be best protected from wind and storm conditions Go to www grandiogreenhouses com for founda tion ideas and tour our online learning center for tips and tricks for putting your greenhouse togethe...

Page 5: ...02B 602B 602B 602B 609 609 609 609 607 L21 610 610 630 630 610 610 630 630 601A B 601A B 601A FL 601A FR L08A X L08A X L08C X L08C X 609 609 610 630 609 609 610 630 L08A 622 L 622 R 603C 603C L08C L08...

Page 6: ...ASSEMBLY INSTRUCTION STEPS STEP ONE BASE ASSEMBLY STEP TWO FRONT ASSEMBLY STEP THREE BACK ASSEMBLY STEP FOUR MIDDLE ASSEMBLY STEP FIVE DOOR ASSEMBLY G R E E N H O U S E S GRANDIO 5...

Page 7: ...suring tape to ensure all corners are the same Use level on all four sides BASE MUST BE LEVEL SQUARE FOUNDATION MUST BE PROPERLY ANCHORED PRIOR TO GREENHOUSE ASSEMBLY B W06 must be cut for patio or de...

Page 8: ...nd a shady area protected from the wind Panels can burn grass and plants if in direct light 7 STEP TWO GRANDIO T I P We recommend watching our how to assembly videos with tricks and tips for easier as...

Page 9: ...601B s and slide into the groove of the 603E 2 3 Install WG02 s into 2 601B s then tighten S05 screws when extrusions are completely tight see Note the fat end of the WG02 will always be on the bottom...

Page 10: ...th sides as shown in Y3 1 Y3 2 601B 601B 601B 601B 603E WG01 WG02 WG02 603D W04 W04 1 W04 1 S04 ML01 W04 603E 603D 9 STEP TWO W04 1 603D 601B GRANDIO T I P Transparent Film Outside Greenhouse Opal Whi...

Page 11: ...OOR FRAME TIP If necessary you may use a screwdriver to wedge behind the bolt head This prevents bolt from falling into the track S04 601A FR ML01 619 INSIDE Inside View 601A FL 601A FR 604 R 604 L 61...

Page 12: ...iver along edges gently stretching the 606 to allow room for panels to fit 2 9 Insert Y1 polycarbonate panels into place make sure Y1 s slide completely into 606 as show in 2 10 Attach 2 603C s to 2 L...

Page 13: ...the 2 604 s square the frame with carpenter square or use a measuring tape to make sure corner mea surements are the same also check distance across from the top of 601A s and also to the bottom of t...

Page 14: ...acement Inside View GRANDIO T I P Make sure the UV coated side of the panel faces outward as indicated on the panels Avoid placing the polycarbonate panels in the sun or near plants until fully assemb...

Page 15: ...shown in diagram 3 3 Install WG02 s to connect 2 601B s when firmly placed between the extru sions tighten the S05 screws see Inside View 601B 601B 601B 601B WG01 WG02 WG02 601B WG02 GRANDIO T I P PR...

Page 16: ...ing S04 ML01 fastener as shown in diagram 3 5 Attach the 4 606 s to the L08A as shown in 3 6 Insert the Y4 polycarbonate panels into the grooves of 601A 602D and 602C Make sure Y4 panels are inserted...

Page 17: ...s in each 603C to the L08B and to each 601A B 602D and the 602C When aligned tighten the middle first and work your way outward See diagrams 3 8 Insert the Y5 1 and Y5 2 polycarbonate panels into plac...

Page 18: ...WG01 into the 602C When all members are snug tighten all fasteners to lock into place BACK CONTINUED Y1 Y1 Y1 Y1 601A B 601A B 602C 602D 602D Y4 1 Y5 1 Y5 2 Y4 2 601B 601B 601B 601B 601B W04 2 W04 2 W...

Page 19: ...s with fasteners as shown in GRANDIO T I P Square by loosening bolts attached to the tops of the L08B X use measuring tape to make sure corners to corner measures the same ML01 S04 602D L08B X L08A B...

Page 20: ...P You will need a minimum of 2 people to complete the middle assembly of your greenhouse The more people the merrier at this stage of assembly 19 STEP FOUR Base W05 L08C Inside W05 Base 601A Front Sid...

Page 21: ...to the front section 601A s using the ML01 S04 nut and bolt as shown in Using tape temporarily attach the loose end of the L08C s to the base kit as shown in MIDDLE ASSEMBLY CONTINUED 20 STEP FOUR Ta...

Page 22: ...m of L08C X to L08C W05 and base as shown in Repeat steps for other side The L08C X braces will hold the front up vertically without assistance Make sure the W05 clip is snug to the base 4 6 To instal...

Page 23: ...UR 4 7 With 2 people attach the ridge to front and back by sliding into place as shown in and using S04 ML01 fasteners attach the 607 to the 601B s as shown in 607 607 601B Side Angle View Outside Vie...

Page 24: ...4 ML01 nut and bolt See 2 Now move the loosened S04 ML01 nut and bolt currently attached to the 601A upward to firmly secure the L08C X 609 and 601A together as shown in 3 Repeat steps 1 and 2 for the...

Page 25: ...g a S04 ML01 nut and bolt and W05 base clip as shown in Note Where the L08C X reattaches to the L08C and the 602A be sure to secure them with a W05 base clip to the base see 3 Repeat for the other sid...

Page 26: ...nly on both sides of roof Do not attach remaining 602B s to lower roof section until roof vents are attached see 4 13 Insert Y11 panels to upper roof section then slide the 630 into the groove of the...

Page 27: ...ort do not place nearest the front or back as you will need a 602B support to keep in window vent in place Place directly across from each other for best cross draft ventilation see for optional place...

Page 28: ...vent and attach the handle onto HQC02 middle pin the first two holes of the handle to the first two holes of HQC02 Then attach HQC02 to 603 with Z04 screws see 603C 618 616 616 603C HQC02 603C 616 HQC...

Page 29: ...ower roof of your greenhouse Panels may slide out before gutters are in place You may want to place a piece of tape on the panel to prevent sliding as shown below once the panels are in place 4 20 Sli...

Page 30: ...nd back as shown below Squeeze a small amount of rubberized silicone or construction adhesive into the ends of ridge 607 to secure pressure fit end caps 601 As show in images on the right Use Z03 scre...

Page 31: ...DOOR ASSEMBLY DIAGRAM Z01 622 Y6 Y6 622 R UP UP Double Ball Catch 620 Z01 Z01 Z01 Z01 Z01 623B 623A 622 Side View 622 J08A Bottom View 623B 620 623A J08A J08A 622 L UP UP Side View 622 J08A Bottom Vie...

Page 32: ...nd 620 as shown in 5 3 Insert Y6 windows into position as shown in make sure to match doors up to each by laying out parts for other door now so window panels face the right direction to the sun and t...

Page 33: ...ws as shown in 5 6 Follow the same instructions for the other door making sure that the 622 L and 622 R with the double ball catch match up so doors will latch closed and slide properly Y6 Y6 623B 623...

Page 34: ...hanging door track with door header move bolts on L21 to line up with bolt holes on door header 603D From the inside attach the S02 nut and bolt set and tighten while holding firmly as high as possib...

Page 35: ...622 HNDL NUT BOLT provided to both doors as shown below in and We included some felt dots in your Grandio Welcome Kit please apply to the inside bottom edge of the 623B as shown in these felt dots wi...

Page 36: ...n below in diagram and Attach 2 J07 to the ends of L21 see The L28 should align square to the 601A 5 11 Remove all plastic film from polycarbon ate window panels immediately at this step DOOR INSTALLA...

Page 37: ...and the 609 and the 601B meet see repeat on the front section 5 14 Attach the BZ1 s to the roof line as shown in diagram with the ML01 S04 We suggest that you measure up 4 3 4 from the 609 on both si...

Page 38: ...8 ROOF 84 BACK 67 BACK 67 BACK 47 5 16 FRONT 21 7 8 ROOF 21 7 8 ROOF 17 FRONT 65 9 16 FRONT THEY WILL BE PACKED TOGETHER QTY 2 1 1 8 6 10 12 20 1 1 1 1 8 10 1 1 1 PICTURE 607 609 610 630 619 L08A L08B...

Page 39: ...X30 4 6X16 MM 4 6X16 MM 3X25 MM 2 4 2 4 4 8 2 8 4 5 9 2 1 13 9 17 4 L08B X L08C X L08D X L08E X 620 L21 622 622 L 622 R 623A 623B J04 J07 J08A L28 ALL MODELS ALL MODELS ALL MODELS ALL MODELS ALL MODEL...

Page 40: ...BACK PLATE MID BASE BACK PLATE BASE CLIP BASE CLIP CORNER ANCHOR DOOR HANDLES PACKED TOGETHER 2 4 2 4 1 14 18 4 4 2 0 2 0 2 15 19 4 4 4 39 S02 S03 M01 ML01 S04 S05 JG01 JG02 A B JG03 A B BZ 1 CZ 1 ALL...

Page 41: ...FRONT PANEL FRONT PANEL FRONT PANEL BACK PANEL BACK PANEL BACK PANEL BACK PANEL 6 1 1 1 1 1 1 1 1 Y6 Y7 Y8 Y9 Y10 Y11 ALL MODELS GRA 88 GRA 812 GRA 88 GRA 812 GRA 88 GRA 812 GRA 88 GRA 812 GRA 88 GRA...

Page 42: ...nd related expenses for removal installation or replacement of the greenhouse or its components are not covered under this warranty 4 This warranty does not cover scratching or scuffing of the product...

Page 43: ...NUAL KEEP IN A SAFE PLACE FOR REFERENCE CONTACT US IF YOU NEED HELP OR HAVE MISSING OR DAMAGED PARTS GRANDIOGREENHOUSES COM BACKYARD LIVING SOURCE INC 9543 W EMERALD ST SUITE 101 BOISE ID 83704 1 866...

Reviews: