background image

Decorative frame A

32mm

1

2

m

m

WB5

WB7

WW3

GG3

GG7

UHD130

DY3

DY1

DY4

DY2

AW6

6

1

7

8

2

9

10

3

11

5

4

12

/a

/a

-

b

/b

/c

-

d

/e

-

f

/c

-

d

/e

Screen structure

Decorative frame B

Front view

Vertical decorative

frame

Back

      

View

Decorative frame

Hanging plate

Buckle plate

S1teel bar

Sliding tension

spring

Inner frame

Round nut

Support bar

Fabric

Screen

 front view

Structure diagram

Horizontal 

inner frame B

Horizontal 

inner frame A

Buckle

plate

Hanging

plate

Side 

view

Support bar

Horizontal

 

inner

frame A

Washer

Horizontal

 

inner

frame B

Vertical

 

inner

frame 

Fabric type

Ordinary

Acoustic 

fabric

ALR

Code

Projector 

type

Standard throw or short throw

Ultra short throw

Screen component

Please check whether the screen components are complete before assembly; some screws and accessories have a margin for replacement
during the installation process.

Vertical decorative frame(2pcs)

Horizontal frame A/B(2pcs each)

Corner

Horizontal frame

 connection part

(Pre-installed)

Support bar and connecting piece

Plastic corner(4pcs)

Steel bar(long :2pcs, short :4pcs)

Fabric(1pc)

Black audio mesh

(

only equipped with woven

 acoustic fabric)

Round nut

(18pcs Pre-installed)

Sliding tension spring

(Pre-installed,10set backup)

tapping screw(6pcs)

 plastic expansion tube(6pcs)

Fasten piece  (12 pcs)

Hook(2pcs)

glove(2 pairs)

Hanging plate, magnetic chuck,

 attached disk 2pcs each

M5X8

 

screw (28pcs)

M6X4

 

screw (4pcs)

M5X8

 

Countersunk

 head screw (4pcs)

Screen assembly method

Inner frame connection method

a.  In  order  to  make  the  packaging  easier,  the  inner  frame  and  the
decorative  frame  have  been  fixed  together  at  the  factory.  Before
assembling the inner frame, please separate the inner frame and the
decorative frame at first ,use the screwdriver, to remove the screws on
the fasten piece; separate all the inner frame and the decorative frame
and place them on the pearl cotton film.

b. Connect the horizontal inner frame: take the horizontal inner frame A with
the  pre-assembled  corner  piece  to  connect  the  corresponding  horizontal
inner  frame  B;  Method:  insert  the  corner  piece  into  the  corresponding
groove until the buckle pop up, lock the M5X8 screw; finish the connection
of two horizontally inner frame.

c.  Check  the  pre-assembled  parts:  take  the  connected  horizontal  inner
frame  and  the  connected  vertical  inner  frame  and  put  them  like  a  rectangle.
Check the number of the springs and round nut in the inner frame is correct.
please make up enough first If you find it is missing,. (The number of screen
punches = the number of  springs, the long side and the short side correspond
one by one)  show as the follows chart.

16

 : 

9

 

or

 

16

 : 

10

92

 

10

6

106

 

110

 

12

8

133

 

14

9

150

 

16

10

100

 

12

7

120

 

14

8

14

8

12

7

16

10

Proportion

Screen size

Number of 

long sides

Number of 

short sides
Number of

round nut

Fixed value: horizontal frame: 7pcs 

and vertical frames: 2pcs

Remarks: the round nut of DY1, DY3 are more than other fabrics.(see the
chart in grey color)

d.  Connect  the  horizontal  and  vertical  inner  frames:  use  the  corner  piece  to
connect the nearby frames and move the position to make both buckles pop
up. It is recommended to connect the inner frame from steps by steps (figure
I/c-d). (Note: the edge of the cut is sharp please careful when install; when the
buckle  is  not  in  place,  it  can  be  used  a  small  steel  rod  to  adjust  by  inserting
into the hole.)

e. support bar installation: Take the support bar, Insert the plastic connection
part at both ends and fix it with the M5X8 screw on the round nut in the middle, 
adjust it to the center, and complete the installation of the inner frame.

f. Note: If the screen you are purchasing is a woven acoustic screen, you must
insert a black Non woven fabric between the frame and the fabric to block the
reflective light of the aluminum frame before installing the screen.

Swipe left 

and right

Slide in

Screen installation

a. Place the fabric on the EPE foam(viewing area side face down) (note that
the ground must clean, and there should be no raised objects on the bottom of
the screen). The frame is placed face down on the screen, take the long steel
bar inserted into the corresponding crimping holes respectively to ensure that
The exposed ends of the steel bar are all equal in length. (The two longer steel
bar penetrate into the short side holes of the fabric)

b. Adjust the position of the frame and the fabric to make it centered; reduce the 
difficulty of fabric installation.

c. Use the hook to adjust the springs position, every spring should be dragged
to the corresponding screen holes to prepare the installation screen.

d. Fold the fabric edge, pull the springs with the hook, and hang the it on the steel
bar  in  the  hole  of  the  fabric;  it  is  recommended  to  hang  the  2-3  springs  in  the
middle of the four sides, adjust the position of the fabric to center, and then hang
the four corners, and finally Hang up all the rest.

e.  If  there  are  creases,  fluffs,  etc.,  the  reason  is  that  the  fabric  is  not  fully
tightened, you can gently adjust it from the middle to the outside until the four
corners of the fabric completely cover the border of the frame.

Same

length

Centere

d

Precautions:

1. When you purchase a flexible soft fabric, due to the shrinkage of the fabric
material, the size of the fabric will be reduced after a long time, and it can be
appropriately stretched during installation.

2. If the force is too large to pull the spring, it will cause permanent deformation.
Then please replace the springs.

3. The DY1 and DY3 screens are marked with the "up" and "down" directions
when leaving the factory. Please keep in mind when installation .

Fabric

Fabric

Correct

Incorrect