background image

Vortex Pro Combi – Internal Models 

1.  Remove front and top boiler casing panels. 

Loosen (do not remove) the four screws 
securing control panel to the side panels. 
Hinge the panel forward to access top and 
rear of control panel.

2.  Remove the two screws and lift off the 

terminal block cover from top of control 
panel.

3.  Remove both the Red and Black wire links 

from terminals 17 & 18 and 19 & 20 on 
control panel.

4.  Carefully push through and remove square 

pre-cut 'knockout' section in the control 
panel front.

5.  Connect 

four

 wires provided to terminals of 

the electronic programmer – refer to Section 
2 above.

Note that the 

Yellow 

wire supplied in the kit 

must not be used.

4. Connection diagram

6.  Feed the wires through hole in control panel 

front and then up through rectangular 
opening in control panel top. Connect wires 
to terminals on control panel – refer to 
Connection diagram.

7.  Locate the electronic programmer in the 

square hole in control panel front – with the 
terminals pointing to the

 right

. Secure by 

turning the two screws (in upper right and 
lower left corners) a quarter turn clockwise. 

8.  Re-fit terminal block cover on control box 

and fasten with the two screws. 

Refer to the instructions on the following pages 
for operating and setting the programmer.

IMPORTANT: After fitting the programmer 
leave these instructions with the User.

2

3

4

5

M

Electronic

programmer

N - Blue

L - Brown

HW On - Orange

HW Off - Yellow

CH On - Red

21

Blue

Brown

Orange

Red

22

17

19

2

Blue

Brown

Orange

Red

1

7

Yellow

6

5

Vortex Pro Boilers - Wiring terminals

Pro Combi e

(internal models)

Pro Kitchen/Utility

(system & non-system)

NOTE: 

When using the EP kit with an ‘S-plan’ type control system (using 

2 x 2 - port zone valves) the YELLOW wire is not required and should not be used.

IMPORTANT - 

For Vortex Pro Combi e boilers the 

YELLOW wire must not be used

.

Programming sequence diagram

Reset (first installation adjustment)

Review/adjust

Menu

Set time: Hour

Hour blinking, using 

 to select, then OK 

+/-

to confirm

Set time: Format 24h or am/pm

24h blinking, using 

+/-

 to select, then OK to confirm

Set time: Minute

Minute blinking, using 

 to select, then OK 

+/-

to confirm

Set time: Day

Monday (1) blinking, using 

 to select, then OK 

+/-

to confirm

Set Program: P01/ P02/ P03 

or P--

Using +/- to select, then OK
To set ON/OFF times
Or
Press Menu to terminate
programming

Note: 

P01-P03 
are pre-set

 

P01is pre-set

Set Program: P01/ P02/ P03 

or P– –

Setting switching times:

First free memory location
blinks

Press 

‘-’

 to go back one

memory location
Press OK for setting the 
switching times.

 

Menu

 

OK

Prog01

Setting switching times:

First free memory location
blinks
Press OK for setting the 
switching times.

Set switching ON time:Hour

Hour blinking, using 

 to select, then OK 

+/-

to confirm

Set switching ON time:Minute

Minutes blinking, using 

 to select, then OK 

+/-

to confirm

Set switching ON time:Days

Mon Su (1 7) blinking, using 

 to select, then OK 

+/-

to confirm

Set display: channel 1 or 2

Ch1 blinking, using 

 to select, then OK 

+/-

to confirm

Set switching OFF time:Hour

Hour blinking, using 

 to select, then OK 

+/-

to confirm

Set switching OFF time:Mnute

Minute blinking, using 

 to select, then OK/Menu 

+/-

to confirm

A maximum of 20 memory locations

can be occupied:

10 switching ON times

10 switching OFF times

Menu

Run

7

2

(see note)

Summary of Contents for EPKIT

Page 1: ...ll remain and the programmer will retain the time and on off program settings It will not have to be reset when the supply is restored The programmer is supplied with three pre set program options each giving different On Off settings Refer to page 3 To select and use a pre set program Please note that these pre set programs will switch both heating and hot water ON and OFF at the same times Alter...

Page 2: ... Boilers Wiring terminals Pro Combi e internal models Pro Kitchen Utility system non system NOTE When using the EP kit with an S plan type control system using 2 x 2 port zone valves the YELLOW wire is not required and should not be used IMPORTANT For Vortex Pro Combi e boilers the YELLOW wire must not be used Programming sequence diagram Reset first installation adjustment Review adjust Menu Set ...

Page 3: ... Res Menu OK 1h 1 3 Set hour 1 1 2 1 Select hour by pressing or 2 Confirm setting by pressing OK 1 Select minutes by pressing or 2 Confirm setting by pressing OK 1 Select week day or by pressing or 2 Confirm setting by pressing OK Res Menu OK 1h 1 1 2 1 Either select pre set program P01 by pressing Menu or 2 Press to go to P02 1 Either select pre set program P02 by pressing Menu or 2 Press to go t...

Page 4: ...2 24 0 2 4 6 8 10 12 4 To change from Summer to Winter time To quickly alter the time setting of the programmer when changing from Summer to Winter time or back 5 To manually override automatic operation If you want to override the automatic operation of the programmer and set either the Heating or Hot water channel to ON or OFF use the or keys as follows Res Menu OK 1h 1 2 3 4 5 6 7 14 16 18 20 2...

Reviews: