Commissioning
Commissioning Check List
Grant Solar Thermal
Solar pre-heat store type.
Combined with
DHW/
Separate from
DHW
Solar primary heat exchanger type.
Copper/
Steel/
Plain/
Ribbed
Solar primary heat exchanger area.
m
2
Volume of dedicated solar pre-heat.
Litres
Location of DHW isolation valve.
Method of anti-scalding in DHW distribution.
Pump control/thermostatic mixer valve
Location of digital temperature gauge fitted to monitor risk of DHW overheating.
Limescale risk to heat exchanger.
Low/
Medium/
High
Limescale control in heat exchanger:
Cleaning
hatch/
Thermostat
on primary
circulation
Expected annual delivered solar energy to taps.
kWh
Expected annual solar fraction of DHW.
per cent
Method of performance calculation.
SAP2005/
Other
Daily DHW load assumption
Litres
per day at
ºC
Date of site visits for bacterial, water quality and access risk assessments.
Commissioned by
On behalf of
Date system commissioned and handed over
Signature of commissioning engineer
Signature of user to confirm receipt and understanding (optional)
15
Commissioning
Commissioning Check List