CE7000-UM-251-9370 2-15
2 Setup
2.2.5 Installing the optional basket for CE7000-130/160
Procedure
(1) Take out the following part of stand from the packing box.
Allen wrench (for M5 cap screw)
M5L10 flange cap screw x 8
Basket Cloth Arm x 4
Basket tube short x 2
Basket tube long x 1
Basket Cloth x 1
(2) Attach the basket cloth arms to the foot of stand.
Confirm the direction of basket cloth arm as shown in the picture below, and then attach the basket cloth
arm to the foot of stand.
Fasten with the eight M5L10 flange cap screws (two long screws for each basket cloth arm), using the
Allen wrench.
!
!
Summary of Contents for CE7000-130
Page 1: ...CE7000 UM 251 00 9370 CUTTING PLOTTER SERVICE MANUAL CE7000 40 60 130 160 130AP ...
Page 2: ......
Page 4: ...CE7000 UM 251 9370 II ...
Page 72: ...CE7000 UM 251 9370 5 2 5 RECOMMENDED PARTS LIST ...
Page 74: ......