CE7000-UM-251-9370 7-64
7 DISASSEMBLY AND REASSEMBLY
7.4
Confirming the cable wiring
When the cables were reconnecting to the connector, confirm each cables are connected correctly.
Specially confirm the following cables are reconnected correctly.
• The cables from the X-motor to the main board.
• The cables from the Y-motor to the main board.
•
The flexible cable (Cam sensor flexible cable) from the cam sensor board to the main board.
•
The flexible cable (Y flexible cable) from the Y relay board to the main board.
•
The flexible cable (Control panel flexible cable) from the control panel board to the main board.
Confirming the cables wiring from the X-motor to the main board
The cables for X and Y motor has same connectors, therefore do not connect those cables incorrectly.
The X motor has the power cable and the encoder cable, connect these cables to correct connectors as
shown in the picture below.
CE7000-130/130AP/160
CE7000-40/60
Main board
X motor
X motor power cable
X motor encoder cable
X motor
Summary of Contents for CE7000-130
Page 1: ...CE7000 UM 251 00 9370 CUTTING PLOTTER SERVICE MANUAL CE7000 40 60 130 160 130AP ...
Page 2: ......
Page 4: ...CE7000 UM 251 9370 II ...
Page 72: ...CE7000 UM 251 9370 5 2 5 RECOMMENDED PARTS LIST ...
Page 74: ......