FC2240-UM-251-9370
1-7
1. INTRODUCTION
1.6 Mounting Procedure
Screws provided for assembly
1. M4 x 8 bind-head screws: 8
2. M3 x 8 bind-head screws: 6
Procedure
(1) When mounting the FC2240 unit onto the stand, make sure that it is correctly oriented. The three cables
protruding from the FC2240 should be at the control box side.
(2) Position the FC2240 so that the underside of the frame is mounted on top of the stand.
After the FC2240 unit has been mounted on the
stand, insert the cables protruding from the underside
into the control panel box.
The control panel box is affixed to the side of the stand with
four M3 x 8 screws at the top and two at the bottom.
To facilitate the mounting of the control box on the stand,
insert the screws into the stand side first, leaving a gap,
and then mount the control box.
Control box
Note:
The surface with the M3 tapping screws
is the surface on which the control box is mounted.
FC2240 frame
Two L-shaped brackets
FC2240 frame
Two L-shaped brackets
Screw in the M4 x 8 screws into the
brackets from the underside.
There are two screws each at four
locations, for a total of eight screws.
Summary of Contents for FC2240
Page 1: ...CUTTING MACHINE SERVICE MANUAL FC2240 FC2240 UM 251 04 9370...
Page 2: ......
Page 8: ...FC2240 UM 251 9370 vi...
Page 38: ...FC2240 UM 251 9730 3 15 3 OPERATIONS Sample printout by the CONDITION function...
Page 42: ...FC2240 UM 251 9730 4 2 4 DAILY MAINTENANCE AND STORAGE...
Page 70: ...FC2240 UM 251 9370 7 26 7 DISASSEMBLY AND ADJUSTMENT...