FC9000-UM-251-9370 8-2
8 Electrical Adjustment
8.2 Flowchart of the Adjustment Sequence
8.2.1 When the main board was replaced (Normal procedure)
When the main board was exchanged, copy adjustment values to the main board from the NV-RAM
(memory) of cam sensor board by the following procedure.
Update the System Firmware (Refer to subsection 8.6.).
Set the dip switch for corresponding model (Refer to subsection 8.3.).
Copy the adjustment values from the SUB-NVRAM to main board (Refer to subsection 8.7.).
Clear the NOV-RAM for corresponding model (Refer to subsection 8.7.).
End of adjustment
Summary of Contents for FC9000-100
Page 1: ...CUTTING PLOTTER SERVICE MANUAL FC9000 75 100 140 160 FC9000 UM 251 01 9370...
Page 2: ......
Page 4: ...FC9000 UM 251 9370 II...
Page 38: ......
Page 201: ...FC9000 UM 251 9370 10 2 10 PARTS LIST Outer Casing 1 2 3 4 10 7 11 5 16 15 6 12 12 9 13 14 8...