16
8935CF — Instruction Manual
Installation
10.
Secure the LC jumper assembly to the module by carefully inserting the
cables into the plastic fiber guides. Do not force the cables into the
guides or they can break.
Channel 3 and Channel 4 Submodule and Fiber Cable Installation
Repeat this procedure for the second submodule on the other side (bottom)
of the module.
illustrates the bottom of the module. This sub-
module will output Channel 3 and Channel 4 and will install in SCA-2 con-
nector, J2.
Note
Make sure the Tx3 cable goes to the Ch 3 output LC adapter and the Tx4 cable
goes to the Ch 4 LC adapter.
Figure 8. Installing SMV_SFP on Bottom of 8935CF Module