126
Getting Started with the Multiviewer
Getting Started Introduction
Getting Started Introduction
This section describes a quick set up procedure to carry out basic setting up of the
UCP
-
3901 and basic exercising of the Multiviewer SDC.
The UCP
-
3901 Card from the factory must be licensed to carry out one of the software-
defined core functions it is capable of. A new UCP
-
3901 Card contains all available software-
defined cores, including the Multiviewer SDC, but no licenses are present.
A new module defaults to the Essence Processing SDC functionality and will need to be
licensed for the Multiviewer SDC in order to be used as a multiviewer.
Getting Started Procedure
The procedure below carries out some basic setting up of a UCP
-
3901 Card to configure it
be a Multiviewer SDC; this includes selecting the multiviewer core and setting up Ethernet
interfaces. The procedure will then describe how to configure the Multiviewer SDC for
receiving and sending video IP streams and modifying the multiviewer video wall.
This procedure includes:
•
STEP 1: Preliminary Multiviewer SDC Configuration
•
3901 Media Interface(s) Setup (Video IP Streams)
•
STEP 3: Make a Change to the Video Wall
Assumptions
It is assumed that:
• The UCP
-
3901 is new and from the factory.
• The UCP
-
3901 Card has been installed into the frame. See
• A control network is available to configure the card. See
• A media network is available to:
• source video IP streams for the module; and
• receive multiviewer head display output video IP streams from the module.
• You have established a RollCAll connection with the card. See
• The multiviewer license has been installed on the card. See
on page 15 for a list of available licenses. See
Installing a License into an UCP
page 188 to install the license(s).
• The firmware in the UCP
-
3901 has been upgraded to the latest available firmware. See
Summary of Contents for UCP-3901
Page 1: ...User Manual 13 03084 010 M00 AB 2020 10 27 UCP 3901 UNIFIED COMPUTE PROCESSOR FOR DENSITÉ ...
Page 18: ...18 Introduction Supported SFP28 Cartridges ...
Page 32: ...32 UCP 3901 Card Installation and Operation Remote control using RollCall ...
Page 36: ...36 Connections and Cabling Cabling to Support SMPTE ST 2022 7 with a UCP 3901 ...
Page 122: ...122 Essence Processing SDC SFP Configuration ...
Page 202: ...202 Maintenance Troubleshooting Keep Fiber Connections Clean ...