2019-06-12
401-705M
YP3025A
Operating Instructions
36
Two tools are in mounts on the bottom of the walkboard:
a wrench;
an Air-Pro
®
Meter clean-out funnel.
It is easier to remove and replace these tools with the
Planter lowered.
The wrench end fits the nut weldment of the spring force
cam (page 69).
The funnel is used for meter clean-out (page 100).
As necessary for auger clearance, open walkboard top
railing. At each side, pull cross-pins
out and make
1
/
4
turn. Release pin into shallow detents. Swing railing
toward hopper.
Auxiliary Hydraulics
Refer to Figure 37, Figure 38 and Figure 39
The planter Planter includes, as standard equipment, an
auxiliary hydraulic circuit, intended to power a seed
auger for loading bulk hoppers.
The Aux quick-disconnect ports
are on the frame. This
circuit is shared with the markers (if installed).
If markers are not installed, the Aux/Marker circuit is
always in Aux mode.
Operating Auxiliary Hydraulics
The Planter needs to be unfolded for convenient access
to the manual hydraulic valve.
1. Fold any extended markers and set the tractor lever
for the marker/aux circuit to Neutral.
2. If no markers were unfolded, set the Clutch Folding
Module Marker/Fold switch
to “Marker”.
Figure 35
Walkboard Tools
31547
3
4
Figure 36:
Walkboard Swing-Down Rail
29309
5
1
Figure 37
Auxiliary Hydraulic Ports
29269