YP3025A
Operating Instructions
55
2019-06-12
401-705M
Field Operation
and “
First Pass Operation Checklist
Page
1.
Set tractor 3-point hitch to “depth control”
operation (and not load control)
-
2.
Unfold marker on next-row side.
3.
Set fan hydraulic circuit to low flow,
engage circuit. Gradually adjust fan
hydraulic flow to obtain recommended
initial fan rpm.
4.
Prime meters with seed.
Leave fan running.
5.
Engage hydraulic seed drive via seed
monitor. Refer to seed monitor manual.
-
6.
If Planter has a fertilizer system integrated
with the DICKEY-john seed monitor, set
the “Fert.Pump” switch on the Clutch
Folding Module to ON.
7.
In the CLUTCH cluster of the Clutch
Folding Module, set all switches, including
Master, to ON.
8.
Pull forward, lower Planter, and begin
planting for a short distance.
9.
Stop. Assess:
•
planting depth
•
seed spacing
•
press wheel operation
•
fertilizer application (if in use)
10.
Make necessary adjustments
Sharp Field Turns Checklist
Page
1.
Fold marker
2.
Raise Planter
3.
Make turn
4.
Lower Planter
5.
Unfold marker on next-row side.
6.
Resume planting.
Suspending Planting Checklist
Page
1.
Stop tractor
2.
Fan hydraulic circuit to Float or Neutral
3.
Fold Marker
4.
Raise Planter
Ending Planting Checklist
Page
1.
Suspend operations as above, then
2.
Install lift locks
3.
Set caster locks to ROAD
4.
Fold Planter
5.
Lights ON
-
6.
Transport