11
Install the Main Landing Gear
❏
1. Install the 3/16” [5mm] axles.
❏
2. Cut the axle to length.
❏
3. File a fl at spot at the end of the axle.
❏
4. Install the wheels.
❏
5. Install the wheel pants.
❏
6. Install the main landing gear on the fuselage.