101
Installation and Maintenance
Step
Procedure
6.Remove electric box cover sub-assy
Loosen the clasps and remove the electric box cover
sub-assy.
7.Remove electric box assy
a
Remove the screw fixing electric box assy.
①
Cut off the wire binder and pull out the indoor tube
temperature sensor.
②
Screw off one grounding screw.
③
Remove the wiring terminals of motor, cold plasma
generator and stepping motor.
④
Remove the electric box assy.
⑤
Screw off the screws that are locking each.
Remove the wiring terminal of power cord. Lift up the
main board and take it off.
Instruction:Some wiring terminal of this products is
with lock catch and other devices.The pulling method
is as below:
1.Remove the soft sheath for some terminals at first,
hold the circlip and then pull out the terminals,
2.Pull out the holder for some terminals at first(holder
is not available for some wiring terminal).hold the
connector and then pull the terminal.
b
C
Main board
Wiring terminal
of motor
Wiring terminal
of stepping motor
Screw
Screw
Clasp
Wire binder
Grounding
screw
Indoor tube
temperature sensor Electric box assy
Wiring terminal
of cold plasma
generator
Circlip
Holder
Connector
Soft sheath