background image

INSTALLATION

Cat. No: PTAC-CORD-1SI   Specifications are subject to change without notice. Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice or without incurring obligations.   ©2016. All rights reserved.

For complete instructions on these and other functions, as well 
as important safety information, see the ETACII Owners Manual.

For more information, visit GreeComfort.com.

1.  Remove front panel. 

a. Pull out at the bottom to release it from the tabs (1). 

b. Then lift up (2).

2.  Remove junction box. 

a. Remove junction box cover by removing three screws from front 

(save these for later).

b. Remove junction box by taking out top, rear and side screws 

(save these for later).

3.  Connect power cord connector to unit connector.

a. Units must be installed using the appropriate power cord kit. 

See Power Connection Chart on page 1.

4.  Re-install junction box and cover. 

Secure power cord.

a. Re-install junction box using parts saved in Step 2.b.

b. Use wire clamp to secure power cord to basepan with 

screw provided.

c. Replace junction box cover using parts saved in Step 2.a.

5.  Replace front panel.

a. Place tabs over top rail (1). 

b. Push Inward at bottom until panel snaps into place (2).

6.  Plug unit in and turn power on.

Unit connecto

Junction box cover Junction box

Accessory

Power Supply Cord

Unit connector

Junction box cover Junction box

Accessory

Power Supply Cord

Unit connecto

Junction box cover Junction box

Accessory

Power Supply Cord

2

1

Wire clamp

Wire clamp

2

1

Accessory 
Power Cord

WARNING

CAUTION
WARNING

WARNING

– Disconnect, lockout and 

tag all electrical power devices to unit including
disconnects, fuses and circuit breakers.

66129920735 

Reviews: