18
Energy-Recovery Ventilation
System Service Manual
2 INSTALLATION SITE
Room air outlet
Fresh air inlet
Service space
Fresh air outlet
Room air inlet
During installation, the two ducts (fresh air inlet and indoor air outlet) outside the room must be installed with anti-
condensate and heat insulating materials, and the ones inside the room should also be installed with them if temperature
and humidity in the ceiling is high. The ducts outside the room should be kept inclined 1/50~1/30 to avoid water into room.
In order to clean and maintain the filter and heat exchanger core in the system, do keep service space, as shown in the
picture above.
3 UNIT INSTALLATION
Air discharge duct
Room air inlet Fresh air outlet
Indoor air supply
Indoor air
return
Room air outlet
Insulation material
Exhaust air duct
Fresh air duct
Fresh air inlet
Summary of Contents for EH01100030
Page 1: ...Energy Recovery Ventilation System Service Manual GC201202 I ...
Page 3: ...1 Energy Recovery Ventilation System Service Manual PRODUCT PRODUCT ...
Page 8: ...6 Energy Recovery Ventilation System Service Manual CONTROL CONTROL ...
Page 9: ...7 Energy Recovery Ventilation System Service Manual CONTROL CONTROL 1 OPERATION FLOWCHART ...
Page 18: ...16 Energy Recovery Ventilation System Service Manual INSTALLATION ...
Page 24: ...22 Energy Recovery Ventilation System Service Manual MAINTENANCE ...
Page 26: ...24 Energy Recovery Ventilation System Service Manual 2 FLOW CHART OF TROUBLE SHOOTING ...
Page 28: ...26 Energy Recovery Ventilation System Service Manual 3 Model FHBQ D15 D FHBQ D20 D ...
Page 34: ...32 Energy Recovery Ventilation System Service Manual 2 Exploded view for model FHBQ D30 M D ...
Page 36: ...JF00300198 global cn gree com ...